Obsidian Axis

1 / 3
Cover · generated artwork, not a photograph
2 / 3
Developer · record as published by Pinly
Map of Obsidian Axis, Mahadevapura, Bengaluru© OpenStreetMap
3 / 3
Location · Mahadevapura, Bengaluru · © OpenStreetMap

Pinly publishes no photography it has not been given. Obsidian Workspaces has not uploaded site photos or floor plans for this project — when they do, they appear here and this generated cover steps aside.

Obsidian Axis

Under construction

by Obsidian Workspaces

Mahadevapura · East Bangalore, Bengaluru

RERA verifiedVerified inventoryAll-in pricingFast responder

This developer replies to enquiries in about 7 min (median, last 30 days) · 47 site visits and 7 bookings in that window.

All Inclusive

₹1.93 Cr – ₹6.78 Cr

₹16,150/sq.ft onwards

Includes GST, stamp duty, registration, car park, club membership and the maintenance deposit — ₹38 L on top of the ₹1.55 Cr base price most listings quote.

Possession
Jun 2028
Status
Under construction
Land area
3.4 acres
Total units
186
Units open
92

Two twelve-floor office blocks on the Outer Ring Road tech belt, sold by chargeable area rather than by carpet. Suites from 1,150 sq.ft, whole floor plates at 4,200.

Configurations

3 unit types · carpet, super built-up, and what each one actually costs

3 unit types · tap for the full price breakup

All-in prices

Taxes and duties are statutory and move with government notification. Carpet area is the RERA definition — the floor you can actually walk on.

Construction progress

Tower-wise, as last reported by the developer.

Overall progress

2 towers · possession Jun 2028

47%

  • Block A

    12 floors · Expected Mar 2028

    58%

  • Block B

    12 floors · Expected Jun 2028

    35%

Progress is developer-reported. Photographs from the last verified site visit are in the gallery.

Amenities

Workplace

  • Double-height lobby
  • Destination-control lifts
  • Food court
  • Conference centre

Building services

  • 100% DG power backup
  • VRV air-conditioning
  • Building management system
  • Fibre-ready risers

Parking

  • Basement car park
  • Two-wheeler bays
  • EV charging
  • Valet drop-off

Safety

  • Fire sprinklers
  • Smoke detection
  • 24×7 access control
  • CCTV

Green

  • Rainwater harvesting
  • STP
  • Low-E glazing

Location

Mahadevapura · East Bangalore, Bengaluru

Map of Obsidian Axis, Mahadevapura, Bengaluru© OpenStreetMap

Approximate position inside Mahadevapura — accurate to the neighbourhood, not to the gate. Map data © OpenStreetMap contributors.

What’s nearby

Straight-line distances from the project gate.

Metro

nearest 1.2 km
  • Mahadevapura (Purple Line)1.2 km

Shopping

nearest 2.4 km
  • Phoenix Marketcity2.4 km

Tech parks

nearest 4.8 km
  • Bagmane Tech Park4.8 km

Hospitals

nearest 6.1 km
  • Manipal Hospital Whitefield6.1 km

Airport

nearest 39 km
  • Kempegowda International39.0 km

Straight-line distances from the project gate. Drive times vary with the corridor.

RERA registration

Registration number

PRM/KA/RERA/1251/446/PR/250912/007415

Authority
Karnataka RERA
Valid till
31 Mar 2029
Status
Verified
Checked on
23 Jul 2026
Open Karnataka RERA portal

Pinly checks this registration against the state portal, but the portal is the only authority. Verify the number, the promoter name and the approved plans yourself before you pay anything.

Payment plans

Percentages are of the agreement value, not the all-in price.

Construction-linked (CLP)

  • On booking10%
  • Agreement20%
  • 6th floor slab25%
  • Façade25%
  • On possession20%

Down payment

  • On booking15%
  • Within 45 days80%
  • On possession5%

What it costs per month

Indicative only — your bank’s rate and eligibility decide the real number.

EMI calculator

on ₹1.94 Cr all-in

Monthly EMI

₹1,34,079

for 20 years at 8.50% · 240 instalments

₹1.54 Cr
₹20 L₹1.94 Cr
8.50%
6%12%
20 yr
5 yr30 yr
Principal Interest
Total interest
₹1.67 Cr
Total payable
₹3.22 Cr
Down payment
₹39 L
Loan to value
80%

Indicative. Lenders rarely fund stamp duty, registration or GST, so the down payment on an all-in price is usually higher than the headline 20%.

About Obsidian Workspaces

Obsidian Workspaces

5 projects on Pinly

Commercial only — offices, retail and showroom floors in five cities. Sells on chargeable area and quotes a yield expectation rather than a bedroom count.

Building since
2005
Delivered
9.8M sq.ft
On time
92%
See Obsidian Workspaces’s full record

More from Obsidian Workspaces

Typically replies in ~7 min · your number is shared only with this developer