Athmanandhasagara 2A
MysuruESS & ESS Infrastructure Private Limited
Plots · 103 plots · price on request
Reported complete
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
MysuruESS & ESS Infrastructure Private Limited
Plots · 103 plots · price on request
Reported complete
MysuruBVL Premio
Plots · 442 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
MysuruMysore university Employees Housing Co-operative Society Limited
Plots · 261 plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
MysuruJR Housing Developers Pvt Ltd
Plots · 189 plots · price on request
Reported complete
MysuruDeepa House Building Co Operative Society Limited
Plots · 288 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
MysuruRoyal Builders & Developers
Plots · 748 plots · price on request
Reported complete
MysuruRivatani Tech LLP
Plots · 37 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
MysuruGSS Project Consultants Private Limited
Plots · 36 plots · price on request
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 38 plots · price on request
Reported complete
MysuruBhoomika Housing Corporation
Plots · 514 plots · price on request
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 391 plots · price on request
Reported complete
MysuruHeritage Homes
Plots · 34 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruKNS Acres LLP
Plots · 55 plots · price on request
RERA completion Due Feb 2026 · no progress reported
Reported complete
MysuruRAJ and RAJ Investments
Plots · 434 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Hunsur, MysuruMahendra Developers
Plots · 141 plots · price on request
RERA completion Due Sep 2025 · no progress reported
Completion date reported to RERA passed
MysuruSRI Ayyappa Constructions
Plots · 151 plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
MysuruBhima Group
Plots · 220 plots · price on request
RERA completion Due Mar 2026 · no progress reported
Completion date reported to RERA passed
MysuruNandi Developers
Plots · 119 plots · price on request
RERA completion Due Dec 2027 · no progress reported
Reported complete
MysuruSriranga Properties
Plots · 60 plots · price on request
RERA completion Due Sep 2025 · no progress reported
Completion date reported to RERA passed
MysuruVyasti Group
Plots · 101 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
MysuruVinyas Group
Plots · 33 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruBhoomika Housing Corporation
Plots · 37 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruBhoomika BTB Ventures
Plots · 61 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruAstor Land Creations LLP
Plots · 46 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruHegde Ventures LLP
Plots · 43 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruBVL Villas
Plots · 74 plots · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MysuruJ Cube Projects
Plots · 197 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Mysuru81 Ventures
Plots · 11 plots · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
MysuruSunrise Innovative Infrastructure Private Limited
Plots · 18 plots · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
MysuruTriambakeshwara Developers and Builders
Plots · 65 plots · price on request
RERA completion Due May 2023 · no progress reported
Reported complete
MysuruBemlemployees House Building CO Operative Society LTD Mysore
Plots · 241 plots · price on request
RERA completion Due Jul 2025 · no progress reported
Completion date reported to RERA passed
MysuruBVL Villas
Plots · 76 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
MysuruGravity ONE Living Space Pvt Ltd
Plots · 23 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruAishwarya Developers
Plots · 66 plots · price on request
RERA completion Due Mar 2025 · no progress reported
Completion date reported to RERA passed
MysuruElite Products Mysore
Plots · 26 plots · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
MysuruFoundations, Developers & Promoters
Plots · 77 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruGoldstone Properties
Plots · 43 plots · price on request
RERA completion Due Aug 2023 · no progress reported
Reported complete
MysuruRekap Advisors and Partners LLP
Plots · 43 plots · price on request
RERA completion Due Jun 2025 · no progress reported
Reported complete
MysuruMysuru Regional Department of Employment and Training Employees House Building Co-operative Society (R) Mysuru
Plots · 1 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruM and M Bangalore Private Limited
Plots · 113 plots · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
MysuruSri Gayathri Developers
Plots · 23 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruPremio Group
Plots · 105 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
Hunsur, MysuruSiddaganga Developers
Plots · 110 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
MysuruRSP Construction and Developers
Plots · 56 plots · price on request
RERA completion Due Apr 2025 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 135 plots · price on request
RERA completion Due Sep 2027 · no progress reported
Reported complete
MysuruMahendra Developers
Plots · 56 plots · price on request
RERA completion Due Oct 2024 · no progress reported
Completion date reported to RERA passed
MysuruShree Vinayaka Developers
Plots · 159 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Hunsur, MysuruSRI Balaji Developers and Promoters Mysuru Private Limited
Plots · 64 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
MysuruSRI Lakshmi Properties
Plots · 146 plots · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
MysuruEarth Shasthra
Plots · 105 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruDeepa House Building Co Operative Society Limited
Plots · 133 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruBhoomika Housing CO Operative Society LTD
Plots · 91 plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
MysuruTapovan Estates
Apartments · 47 units · price on request
RERA completion Due May 2026 · no progress reported
Completion date reported to RERA passed
MysuruKPTCL Salary Employees Housing Co-operative Society ltd
Plots · 228 plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
MysuruArihant Infrastructure
Apartments · 37 units · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 297 plots · price on request
RERA completion Due Nov 2027 · no progress reported
Reported complete
MysuruAstrum Value Homes Private Limited
Plots · 100 plots · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 74 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruBalajikrupa Properties
Plots · 404 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruB S N L Employees Housing CoOperative Society Limited Mysore
Plots · 45 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruBVL Villas
Plots · 88 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruSRI Chamundeshwari Developers and Promoters
Plots · 60 plots · price on request
RERA completion Due Nov 2023 · no progress reported
Completion date reported to RERA passed
MysuruGS Associates
Plots · 42 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 128 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruChamundi Ventures
Plots · 35 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruDaivik Developers
Plots · 48 plots · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 33 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruDhruthi Infrastructures
Plots · 68 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruVeeyes Rai Estates Private Limited
Plots · 610 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruFalcon Tyres Employees House Building Cooperative Society LTD
Plots · 122 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruT Prabhavathi and B R Madam firm
Plots · 41 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruRai Estates
Plots · 157 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
MysuruGSS Project Consultants Private Limited
Plots · 215 plots · price on request
RERA completion Due Dec 2027 · no progress reported
Reported complete
MysuruV P Constructions & Developers
Plots · 33 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruJPN Properties
Plots · 77 plots · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
Nanjanagud, MysuruParamount Developers
Plots · 115 plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
MysuruMysore Realty Private Limited
Plots · 394 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
MysuruAlanahalli House Building Co operative Society
Plots · 87 plots · price on request
RERA completion Due Oct 2023 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruM Squaree
Plots · 121 plots · price on request
RERA completion Due Jan 2024 · no progress reported
Reported complete
MysuruSLS Developers (p) Ltd
Plots · 31 plots · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
MysuruMysore Chamarajanagar District Primary School Teachers House Building CO Operative Society Limited
Plots · 24 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruSri Venkateshwara Developers
Plots · 122 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruJ Cube Projects
Plots · 145 plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
MysuruPaligha Constructions
Plots · 75 plots · price on request
RERA completion Due Nov 2023 · no progress reported
Reported complete
MysuruPrisha Ventures
Plots · 52 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruM-pro Build Groups
Apartments · 56 units · price on request
RERA completion Due Jun 2025 · no progress reported
Completion date reported to RERA passed
MysuruSRI Rajarajeshwari House Building CO Operative Society LTD
Plots · 119 plots · price on request
RERA completion Due Jan 2024 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 107 plots · price on request
RERA completion Due Jun 2026 · no progress reported
Reported complete
MysuruGravity ONE Living Space Pvt Ltd
Plots · 131 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruSri Bhoodevi Builders and Developers
Plots · 47 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
MysuruSraddha Groups
Plots · 118 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Mysuruchethana Builders and developers
Plots · 36 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruUpkar Ventures Private Limited
Plots · 301 plots · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
MysuruUrban Lane Developers Private limited
Plots · 25 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruRowfin Realestates private Ltd
Plots · 30 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruVismaya Developers
Plots · 239 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
MysuruGSS Project Consultants Private Limited
Plots · 97 plots · price on request
RERA completion Due Dec 2027 · no progress reported
Reported complete
MysuruBemlemployees House Building CO Operative Society LTD Mysore
Plots · 162 plots · price on request
RERA completion Due May 2024 · no progress reported
Completion date reported to RERA passed
MysuruAradhya Developers
Plots · 15 plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
MysuruSairam Dwellings Private Limited
Plots · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
MysuruBonitas Group
2, 3 BHK · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
MysuruFoundations, Developers & Promoters
2, 3 BHK · price on request
RERA completion Due Jan 2022 · no progress reported
Reported complete
MysuruSuprabatha Ventures
2 BHK · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
MysuruAakar Properties
2, 3 BHK · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
MysuruEncon Projects
3 BHK · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
MysuruParamount Group
2, 3 BHK · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
MysuruSowparnika Projects and Infrastructure Private Limited
2, 3 BHK · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
MysuruTrendz Housing LLP
1, 2, 3, 4 BHK · price on request
RERA completion Due Nov 2022 · no progress reported
Reported complete
MysuruTanisujan Infra Private Limited
Plots · price on request
RERA completion Due May 2023 · no progress reported
Reported complete
MysuruJagadguru Shree Shivarathreswara Maha Vidya Peetha Nowkarara Gruha Nirmana Sahakara Sangha Niyamitha Mysore
Plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruMysore Zilla Employees Housing Cooperative Society
Plots · price on request
RERA completion Due Aug 2022 · no progress reported
Completion date reported to RERA passed
MysuruManasa Developers
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruMathuranagara
Plots · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruPraveen B S and Pramod S P
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruAstrum Value Homes Private Limited
2, 3 BHK · price on request
RERA completion Due Jun 2020 · no progress reported
Completion date reported to RERA passed
MysuruOxygen Build Ventures Pvt Ltd,
2 BHK · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
MysuruOxygen Build Ventures Pvt Ltd,
2, 3 BHK · price on request
RERA completion Due Mar 2018 · no progress reported
Completion date reported to RERA passed
MysuruMK Infra Holdings Private Limited
3 BHK · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
MysuruSamuday Construction and Developers Mysore
Apartments · price on request
RERA completion Due Jun 2025 · no progress reported
Completion date reported to RERA passed
MysuruBVL Developers
Plots · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
MysuruAishvarya Projects
Plots · price on request
RERA completion Due Nov 2022 · no progress reported
Completion date reported to RERA passed
MysuruVyasti Group
Plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
MysuruFoundations, Developers & Promoters
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
MysuruTiger Urbanscape LLP
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
MysuruVeeyes Rai Estates Private Limited
Plots · price on request
RERA completion Due May 2023 · no progress reported
Reported complete
MysuruGSS Project Consultants Private Limited
Plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruKBL and Sons
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
MysuruKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
MysuruMK Infra Holdings Private Limited
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruMMG Constructions LLP
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
MysuruNandi Associates
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
MysuruDeepa House Building Co Operative Society Limited
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruReliable Estates
Plots · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
MysuruRSL Vastava
Plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Reported complete
MysuruSanthosh Shelters Private Limited
Plots · price on request
RERA completion Due Feb 2023 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Jul 2025 · no progress reported
Reported complete
MysuruSkilltech Engineers and Contractors Private Limited
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Nov 2022 · no progress reported
Reported complete
MysuruValue Promoters Private Limited
Plots · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Oct 2026 · no progress reported
Reported complete
MysuruAakar Properties
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruAayush Builders & Developers
Mixed use · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2025 · no progress reported
Completion date reported to RERA passed
MysuruSamyuktha –Developers and Constructions
Plots · price on request
RERA completion Due Aug 2024 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2025 · no progress reported
Completion date reported to RERA passed
MysuruMK Infra Holdings Private Limited
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruBrigade Group
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Reported complete
MysuruDaivik Developers
Plots · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
MysuruVyasti Group
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
MysuruDaivik Developers
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruFoundations, Developers & Promoters
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruG9 Projects
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruGuru Group
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
MysuruTapovan Estates
Apartments · price on request
RERA completion Due Aug 2023 · no progress reported
Completion date reported to RERA passed
MysuruMysore Intercontinental Hotels Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
MysuruL V R Promoters
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
MysuruPramur Homes and Shelters
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
MysuruUnited Royally Developers
Plots · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
MysuruPramur Homes and Shelters
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruESS and ESS Echo Valleey INC
Plots · price on request
RERA completion Due Nov 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Piriyapatna, MysuruVSan Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
MysuruVastava Group
Apartments · price on request
RERA completion Due Aug 2023 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
MysuruMahendra Developers
Plots · price on request
RERA completion Due Jul 2022 · no progress reported
Completion date reported to RERA passed
MysuruPVR Groups
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
MysuruCaliber Properties
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Hunsur, MysuruKalpataru Property Developers
Plots · price on request
RERA completion Due Oct 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
MysuruDhatri Properties
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
MysuruGSS Project Consultants Private Limited
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
MysuruKNS Projects Private Limited
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
MysuruGSS Project Consultants Private Limited
Plots · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
MysuruRoyale om sai builders & developers
Plots · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
MysuruPalatine Projects
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
MysuruPragathi Group
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
MysuruAvishkar Infrastructure
Apartments · price on request
RERA completion Due Jun 2025 · no progress reported
Reported complete
MysuruPrithvi Infrastructure
Villas & row houses · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
MysuruRishabh Ventures
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Mysurupan associates
Plots · price on request
RERA completion Due Jul 2019 · no progress reported
Reported complete
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Reported complete
MysuruSri Someshwara Developers and Builders
Plots · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
MysuruShri Manjunatha Swami Developers and Infrastructures Pvt Ltd
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
MysuruS & S Builders and Developers
Plots · price on request
RERA completion Due Sep 2026 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Oct 2025 · no progress reported
Reported complete
Hunsur, MysuruG N Rajesh
Plots · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
MysuruRamanashri Developers
Plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
MysuruAknavi Properties
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruSrinidhi Builders
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
MysuruSumaya Properties Private Limited
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2026 · no progress reported
Reported complete
MysuruArmy Welfare Housing Organisatin
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Feb 2026 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MysuruALL Fine Projects
Plots · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
MysuruBenchmark Signature Homes
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Reported complete
MysuruBrigade Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Mysurushoba properties
Plots · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
MysuruGravity ONE Living Space Pvt Ltd
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Hunsur, MysuruCanh Infrastructure Limited
Plots · price on request
RERA completion Due Jan 2022 · no progress reported
Completion date reported to RERA passed
Mysurugovernment employees house building co-op.society ltd.,
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
MysuruBSNL Employees Housing Co Operative Society
Plots · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Hunsur, MysuruVSan Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
MysuruRai Estates
Plots · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
MysuruMahendra Developers
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
MysuruParamount Group
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Reported complete
MysuruPrithvi Infrastructure
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruLotus Value
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruRishabh Ventures
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
MysuruMplex Networks Private Limited
Plots · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
MysuruGayatri Vaishnaoi Constructions Private Limited
Apartments · price on request
RERA completion Due Jan 2019 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Feb 2022 · no progress reported
Reported complete
MysuruSwiss Cottage Infraworld
Plots · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2023 · no progress reported
Reported complete
MysuruBiodiversity Conservation India Private Limited Company
Plots · price on request
RERA completion Due Jul 2017 · no progress reported
Completion date reported to RERA passed
MysuruBrigade Group
Apartments · price on request
RERA completion Due Feb 2019 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
MysuruEagleburg India Pvt Ltd
Plots · price on request
RERA completion Due May 2021 · no progress reported
Reported complete
MysuruEminence Homes and Spaces
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
MysuruFoundations, Developers & Promoters
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
MysuruFoundations, Developers & Promoters
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
MysuruAIR Force Naval Housing Board
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
MysuruKarnataka Housing Board
Apartments · price on request
RERA completion Due Oct 2017 · no progress reported
Reported complete
MysuruMysore Realty Private Limited
Plots · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
Hunsur, MysuruUpkar Developers
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
MysuruParamount Group
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
MysuruPramur Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Showing 97–336 of 346
Prices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.