Projects

New and under-construction projects

5,698 projects from Karnataka RERAHow this works

Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.

The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.

Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.

Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →

49–251 of 251 matching projects · none of these has photos yet, so all are shown

Mixed use

Ellite Residency I

BelagaviUnique Constructions

Mixed use · 36 units · price on request

Due Dec 2026 · no progress reported

Under construction

Mixed use

Shree Datta Smruti

BelagaviShree Radhakrishna Developers

Mixed use · 38 units · price on request

Due Mar 2027 · no progress reported

Under construction

Apartments

Serenity

BelagaviAnand Infrastructure

Apartments · price on request

Due Dec 2027 · no progress reported

Under construction

Apartments

Arvindum Residency

BelagaviShashi Developers

Apartments · 12 units · price on request

100% builtdue Dec 2025

Last reported: 100% built · 15 Jul 2026

Reported complete

Mixed use

Aishwarya Enclave

BelagaviBuiltech Developers

2, 3 BHK · 14 units · price on request

Due Mar 2025 · no progress reported

Reported complete

Apartments

Chirayu Residency

BelagaviChirayu Builders

Apartments · 44 units · price on request

100% builtdue Mar 2027

Last reported: 100% built · 15 Jul 2026

Reported complete

Mixed use

Morya Elite

BelagaviParth Group

Mixed use · 19 units · price on request

100% builtdue Dec 2027

Last reported: 100% built · 15 Jul 2026

Reported complete

Mixed use

Orionis Propus

BelagaviVardhaman Ventures

Mixed use · 17 units · price on request

100% builtdue Dec 2027

Last reported: 100% built · 15 Jul 2026

Reported complete

Mixed use

Ruby Pride

BelagaviVeetarag Ventures

Mixed use · 17 units · price on request

100% builtdue Dec 2027

Last reported: 100% built · 15 Jul 2026

Reported complete

Apartments

Sairaj Enclave

BelagaviSairaj Builders

Apartments · 19 units · price on request

100% builtdue Aug 2026

Last reported: 100% built · 15 Jul 2026

Reported complete

Apartments

Shree Laxmi Arcade

BelagaviShree Infrabuilds

Apartments · 13 units · price on request

100% builtdue Dec 2027

Last reported: 100% built · 20 Feb 2026

Reported complete

Apartments

Sairaj Exotica

BelagaviSairaj Builders

Apartments · 19 units · price on request

100% builtdue Jun 2026

Last reported: 100% built · 13 Apr 2026

Reported complete

Apartments

Vighnarajendra Ideal Homes

BelagaviShree Vighnarajendra Developers

Apartments · 13 units · price on request

100% builtdue Mar 2026

Last reported: 100% built · 14 Jan 2026

Reported complete

Apartments

Galaxy B Apartment

BelagaviBSS Infrastructure

1, 2, 3 BHK · 20 units · price on request

Due Nov 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Arinjay Empire

BelagaviArinjay Constructions

Apartments · 19 units · price on request

100% builtdue Aug 2026

Last reported: 100% built · 2 Jul 2026

Reported complete

Apartments

Honeywell Enclave

BelagaviShubha Shankar Developers

Apartments · 44 units · price on request

100% builtdue Dec 2026

Last reported: 100% built · 7 Feb 2026

Reported complete

Apartments

Meera Resides

BelagaviCGK Constructions and Real Estate Private Limited

Apartments · 33 units · price on request

100% builtdue Dec 2027

Last reported: 100% built · 15 Jul 2026

Reported complete

Mixed use

Orionis Ozone

BelagaviVeetarag Ventures

Mixed use · 30 units · price on request

100% builtdue Nov 2026

Last reported: 100% built · 14 Apr 2026

Reported complete

Apartments

SAI Regency

BelagaviDamag Properties Limited Liability Partnership

Apartments · 16 units · price on request

100% builtdue Feb 2025

Last reported: 100% built · 15 Apr 2026

Reported complete

Apartments

Shree Devamala Residency

BelagaviPanare Builders and Developers

Apartments · 12 units · price on request

100% builtdue Jul 2027

Last reported: 100% built · 12 Jun 2026

Reported complete

Apartments

Ganesh Gardens

BelagaviShree Samarth Constructions

Apartments · 15 units · price on request

100% builtdue Mar 2026

Last reported: 100% built · 20 Feb 2026

Reported complete

Mixed use

Morya Enclave

BelagaviParth Group

Mixed use · 15 units · price on request

100% builtdue Dec 2026

Last reported: 100% built · 16 Feb 2026

Reported complete

Mixed use

Vrushabh Vijeta

BelagaviVrushabh Ventures

Mixed use · 16 units · price on request

100% builtdue Dec 2026

Last reported: 100% built · 14 Apr 2026

Reported complete

Apartments

Shivaay Avenue

BelagaviEfficient Developers

Apartments · 64 units · price on request

Due Jul 2025 · no progress reported

Reported complete

Apartments

Lotus Pride

BelagaviGreen Lotus Infrastructures

Apartments · 12 units · price on request

Due Mar 2026 · no progress reported

Completion date reported to RERA passed

Plots

Layout Ankali

Chikkodi, BelagaviChidanand Basaprabhu Kore Sahakari Sakkare Karkhane Nyt Chikodi

Plots · 70 plots · price on request

Due Mar 2023 · no progress reported

Reported complete

Apartments

Pristine Park Square

BelagaviPristine Park Square

Apartments · 15 units · price on request

Due Sep 2026 · no progress reported

Completion date reported to RERA passed

Apartments

SAI RAJ Apartment

BelagaviVanishree Group

Apartments · 14 units · price on request

Due Dec 2026 · no progress reported

Reported complete

Apartments

Sharad Smit

BelagaviOneness Developers

Apartments · 19 units · price on request

Due Aug 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Shivabasava Enclave

BelagaviSaish Builders & Developers

Apartments · 19 units · price on request

Due Aug 2024 · no progress reported

Completion date reported to RERA passed

Apartments

City Coporation Belagavi 1484 AHP Project

BelagaviCity Corporation Belagavi

Apartments · 1,484 units · price on request

Due Oct 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Ekam Homes

Belagavioneness builders

Apartments · 16 units · price on request

Due Dec 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Elite Residnecy II

BelagaviUnique Constructions

Apartments · 19 units · price on request

Due Mar 2026 · no progress reported

Completion date reported to RERA passed

Mixed use

Heddurshetti Patil Tower

BelagaviHuddurshetti Developers

Mixed use · 15 units · price on request

Due Dec 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Nishigandha

BelagaviShirgurkar Reaaltyy Private Limited

Apartments · 15 units · price on request

Due Dec 2025 · no progress reported

Reported complete

Apartments

North Enclave

BelagaviPristine Group

Apartments · 19 units · price on request

Due Mar 2026 · no progress reported

Completion date reported to RERA passed

Apartments

OM Mallikarjuna

BelagaviShiv OM Enterprises

Apartments · 19 units · price on request

Due Mar 2026 · no progress reported

Reported complete

Apartments

Sanavi Residency

BelagaviAnil Annasaheb Patil

Apartments · 34 units · price on request

Due Dec 2025 · no progress reported

Reported complete

Mixed use

SBM Pride

BelagaviVedika Constructions

Mixed use · 21 units · price on request

Due Jun 2026 · no progress reported

Completion date reported to RERA passed

Apartments

Shree Swami Samarth Sankalp Residency

BelagaviAadishakti Construction Company

Apartments · 25 units · price on request

Due Sep 2025 · no progress reported

Reported complete

Mixed use

Siddhakala Apartment

BelagaviSiddhakala Developers

Mixed use · 13 units · price on request

Due Mar 2026 · no progress reported

Reported complete

Apartments

Trend Landmark

BelagaviTrend Homes Realty

Apartments · 24 units · price on request

Due Jul 2028 · no progress reported

Reported complete

Apartments

Trinity

BelagaviAnand Infrastructure

Apartments · 19 units · price on request

Due Nov 2026 · no progress reported

Completion date reported to RERA passed

Apartments

Unique Plaza

BelagaviUnique Developers

Apartments · 16 units · price on request

Due Dec 2026 · no progress reported

Reported complete

Apartments

Amantran Anant Vihar

BelagaviMs A S Developers

Apartments · 25 units · price on request

Due Mar 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Anu Basavant Homes

BelagaviHome Square Developers

Apartments · 10 units · price on request

Due Jun 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Bramha Apartment

BelagaviBramha Construction

Apartments · 11 units · price on request

Due Mar 2026 · no progress reported

Reported complete

Apartments

Elements I by Atharv Constructions

BelagaviAtharv Constructions

Apartments · 16 units · price on request

Due May 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Enso Living

BelagaviSiddhayani Constructions Private Limited

Apartments · 11 units · price on request

Due Feb 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Estaa

BelagaviSmart Infrabuilds

Apartments · 10 units · price on request

Due Dec 2024 · no progress reported

Reported complete

Apartments

Gardenia

BelagaviSaudagar Urban Lifestlyes

Apartments · 36 units · price on request

Due Mar 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Girnar Enclave

BelagaviShree Balajee Constructions

Apartments · 19 units · price on request

Due Jun 2026 · no progress reported

Reported complete

Mixed use

J P Tower

BelagaviShree Radhakrishna Developers

Mixed use · 8 units · price on request

Due Aug 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Mallikarjun Arcade

BelagaviTrimount Roofs

Apartments · 12 units · price on request

Due Aug 2024 · no progress reported

Reported complete

Apartments

Morya Next

BelagaviParth Group

Apartments · 19 units · price on request

Due Dec 2025 · no progress reported

Reported complete

Apartments

Moti Mahal

BelagaviA H Realty

Apartments · 18 units · price on request

Due Dec 2026 · no progress reported

Reported complete

Mixed use

Nandana Arcade

BelagaviHorizon Groups

Mixed use · 28 units · price on request

Due Jun 2026 · no progress reported

Reported complete

Mixed use

Navchaitanya Residency

BelagaviNavchaitanya Developers

Mixed use · 36 units · price on request

Due Jan 2025 · no progress reported

Reported complete

Mixed use

North East Avenue

BelagaviPristine Group

Mixed use · 27 units · price on request

Due Dec 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Nishigandha Residency

BelagaviHorizon Groups

Apartments · 18 units · price on request

Due Mar 2026 · no progress reported

Reported complete

Apartments

Palm Springs

BelagaviP Square Construction Limited Liability Partnership

Apartments · 16 units · price on request

Due Mar 2024 · no progress reported

Completion date reported to RERA passed

Mixed use

Raghunath Arcade

BelagaviSairam Developers

Mixed use · 19 units · price on request

Due Dec 2026 · no progress reported

Reported complete

Mixed use

Rajnandini Residency

BelagaviBelgaum Infra Build

Mixed use · 34 units · price on request

Due Dec 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Salamat Residency

BelagaviLacasa Builders and Developers

Apartments · 16 units · price on request

Due Jun 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Sanath

BelagaviSanath Initiatives

Apartments · 22 units · price on request

Due Oct 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Shiv Krupa

BelagaviTrident Landmarks

Apartments · 12 units · price on request

Due Dec 2025 · no progress reported

Reported complete

Apartments

Shivabasava Residency

BelagaviShiva Constructions

Apartments · 25 units · price on request

Due Jun 2023 · no progress reported

Reported complete

Apartments

Vijaylaxmi Arcade

BelagaviVijay Builders and Devlopers

2 BHK · price on request

Due Mar 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Sairaj

BelagaviSairaj Builders and Developers

Apartments · price on request

Due Feb 2023 · no progress reported

Reported complete

Apartments

BUILTECH's Rama Residnecy

BelagaviBuiltech Developers

2 BHK · price on request

Due Feb 2022 · no progress reported

Reported complete

Apartments

One leaf

BelagaviAnand infrabuilt

2, 3 BHK · price on request

Due Aug 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Shiva Ganesh Residency

BelagaviAdwaii Construction

Apartments · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Bella Torre

BelagaviAdam Realty Partners Private Limited

1, 2, 3 BHK · price on request

Due Sep 2016 · no progress reported

Reported complete

Apartments

Shree Hari Residency

BelagaviSudhir C Panare

1, 2, 3 BHK · price on request

Due Nov 2023 · no progress reported

Reported complete

Apartments

The one

BelagaviLotus Landmarks (I) Pvt Ltd

3, 4 BHK · price on request

Due Mar 2018 · no progress reported

Reported complete

Apartments

Yogeshwar Enclave

BelagaviYogeshwar Realty

Apartments · price on request

Due Mar 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Pinnacle

BelagaviLotus Landmarks (I) Pvt Ltd

2 BHK · price on request

Due Dec 2019 · no progress reported

Completion date reported to RERA passed

Plots

Athani Residency Park

Chikkodi, BelagaviTanvi Developers

Plots · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Casa Imperia

BelagaviM S K Constructions

Apartments · price on request

Due Aug 2024 · no progress reported

Completion date reported to RERA passed

Mixed use

In Param

BelagaviP K Developers

Mixed use · price on request

Due Mar 2023 · no progress reported

Reported complete

Apartments

Parkview Residency

BelagaviEcosense Builders and Developers

Apartments · price on request

Due Apr 2023 · no progress reported

Reported complete

Villas & row houses

Provisional of Residential Accommodation for Awho

BelagaviArmy Welfare Housing Organisatin

3 BHK · price on request

Due Dec 2018 · no progress reported

Reported complete

Apartments

Royale Arch

BelagaviTrident Construction CO.

1, 2 BHK · price on request

Due Mar 2018 · no progress reported

Reported complete

Apartments

Sanika Landmark "C Wing"

BelagaviSanika Developers

1, 2, 3 BHK · price on request

Due Dec 2018 · no progress reported

Reported complete

Apartments

Sky Villa Grande

BelagaviAdam Realty Partners Private Limited

4, 5 BHK · price on request

Due Apr 2017 · no progress reported

Reported complete

Apartments

Zenith

BelagaviLotus Landmarks (I) Pvt Ltd

2, 3 BHK · price on request

Due Dec 2018 · no progress reported

Reported complete

Apartments

Golden Heights Apartment

BelagaviS Square Builders & Developers

Apartments · price on request

Due Jan 2021 · no progress reported

Reported complete

Apartments

Basavleela Homes

BelagaviHome Square Group Club Road Project

Apartments · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Construction of 1812 Dus

Chikkodi, BelagaviCMC Commissioner Nippani

Apartments · price on request

Due Sep 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Construction of 1812 Dus at Nippani

Chikkodi, BelagaviCMC Commissioner Nippani

Apartments · price on request

Due Jan 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Golden Nest

BelagaviDayaar Group

Apartments · price on request

Due Dec 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Mangesh Residency

BelagaviShashi Developers

Apartments · price on request

Due Jul 2023 · no progress reported

Reported complete

Apartments

One Day Residency

BelagaviOne Day Builders

Apartments · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Safa Heights

BelagaviEdha Infrastructures

Apartments · price on request

Due Apr 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

Samarthgad

BelagaviJS Navnirman Pvt Ltd

Mixed use · price on request

Due Dec 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Shakambhari

BelagaviD and K Associates

Apartments · price on request

Due Jun 2024 · no progress reported

Reported complete

Apartments

Shree Krupasindhu

BelagaviPanare Builders and Developers

Apartments · price on request

Due Mar 2026 · no progress reported

Reported complete

Mixed use

Siddhii Homess

BelagaviSiddhii Homess

Mixed use · price on request

Due Dec 2023 · no progress reported

Completion date reported to RERA passed

Plots

THE Formist Cove

BelagaviFormist Realty Private Limited

Plots · price on request

Due Jan 2022 · no progress reported

Reported complete

Apartments

Tranquillo Meadow

BelagaviShuubharambh Developer

Apartments · price on request

Due May 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Vatsala

BelagaviSachin Zanvar

Apartments · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Vinay Vihar

BelagaviVinay Builders

Apartments · price on request

Due Nov 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

9 Downtown

Chikkodi, BelagaviSiddharth Realty

Mixed use · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

Arpan Enclave

BelagaviAdwaii Construction

Mixed use · price on request

Due May 2022 · no progress reported

Completion date reported to RERA passed

Plots

Banashankari Developers

Chikkodi, BelagaviBanashankari Developers

Plots · price on request

Due Apr 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Cristal Heights

BelagaviS Square Builders & Developers

Apartments · price on request

Due Sep 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Elite Homes

BelagaviAbhiraj Builders and Developers

Apartments · price on request

Due Dec 2022 · no progress reported

Reported complete

Plots

Girijapuri Layout

Chikkodi, BelagaviChinmay Developers

Plots · price on request

Due Apr 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Golden Heights C Apartment

BelagaviBSS Infrastructure

Apartments · price on request

Due Mar 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Jairaj Enclave

BelagaviJairaj Constructions

Apartments · price on request

Due Sep 2023 · no progress reported

Reported complete

Apartments

Lavish Heights

BelagaviBSS Infrastructure

Apartments · price on request

Due May 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Mauli Residency

BelagaviSaanvi Builders

Apartments · price on request

Due Nov 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Mukambika

BelagaviSachin Zanvar

Apartments · price on request

Due Mar 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Nakshatra

BelagaviDesai Patil Developers and Builders

Apartments · price on request

Due Jul 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Nirmal Residency

BelagaviHorizon Groups

Apartments · price on request

Due Dec 2023 · no progress reported

Reported complete

Mixed use

Oneness Empire

BelagaviOneness Builders and Developers

Mixed use · price on request

Due Dec 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Pearl Heights Appartment

BelagaviBSS Infrastructure

Apartments · price on request

Due Apr 2024 · no progress reported

Completion date reported to RERA passed

Apartments

Pride Heights

BelagaviPride Builders and Developers

Apartments · price on request

Due Feb 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Prisma Apartment

BelagaviPrisma Builders and Developer

Apartments · price on request

Due Sep 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Rehmat Heights

BelagaviDayaar Group

Apartments · price on request

Due Oct 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

Sai Smart Residency

BelagaviSmart Constructions

Mixed use · price on request

Due Mar 2022 · no progress reported

Reported complete

Mixed use

Shiv Ganesh

BelagaviParadasie Builders and Developers

Mixed use · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Shivshanti Empire

Belagavioneness builders

Apartments · price on request

Due Oct 2021 · no progress reported

Completion date reported to RERA passed

Mixed use

Shree Prospera

BelagaviShree Builders

Mixed use · price on request

Due Feb 2023 · no progress reported

Completion date reported to RERA passed

Apartments

U R Casa

BelagaviVishwaraj Developers

Apartments · price on request

Due Dec 2019 · no progress reported

Reported complete

Apartments

Urban Tree

BelagaviAchmani Associates

Apartments · price on request

Due Mar 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Vastu Floor

BelagaviVastu Sidhi Promoter and Developer

Apartments · price on request

Due Sep 2023 · no progress reported

Completion date reported to RERA passed

Mixed use

Vastusiddhi Pride

BelagaviVastusiddhi Buildcon Pvt Ltd

Mixed use · price on request

Due Sep 2023 · no progress reported

Reported complete

Mixed use

Viva Square

BelagaviViva Ventures and Realty Partners

Mixed use · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Amar Elite

BelagaviAmar constructions

Apartments · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Bhandare Residency

BelagaviNavchaitanya Developers

Apartments · price on request

Due Sep 2022 · no progress reported

Reported complete

Apartments

Ganesh Heights

BelagaviShri Samarth Builders and Developers

Apartments · price on request

Due Sep 2023 · no progress reported

Completion date reported to RERA passed

Mixed use

Giriraj Avenue

BelagaviTribhuvan Developers

Mixed use · price on request

Due Aug 2023 · no progress reported

Completion date reported to RERA passed

Mixed use

Girnar Pride

BelagaviShree Balajee Constructions

Mixed use · price on request

Due Mar 2022 · no progress reported

Reported complete

Mixed use

Harinandan

BelagaviShirgurkar Reaaltyy Private Limited

Mixed use · price on request

Due Dec 2022 · no progress reported

Reported complete

Plots

Honeywell Shravani City

BelagaviS S Landmark Builders and Developers

Plots · price on request

Due Sep 2023 · no progress reported

Reported complete

Mixed use

Laxmi Park

BelagaviShivalaya Constructions

Mixed use · price on request

Due Jun 2019 · no progress reported

Reported complete

Mixed use

Madhukamal Eternia

BelagaviMadhukamal Developers

Mixed use · price on request

Due Dec 2022 · no progress reported

Reported complete

Mixed use

Morya Carnations

BelagaviParth Group

Mixed use · price on request

Due Sep 2024 · no progress reported

Reported complete

Plots

Navhindbhagya Nagar

BelagaviNavhind Infrastructure Project Private Limited

Plots · price on request

Due Dec 2019 · no progress reported

Reported complete

Apartments

Patel Heights

BelagaviPatel Developers

Apartments · price on request

Due Sep 2023 · no progress reported

Reported complete

Apartments

Pearl Apartment

BelagaviMAC Builders and Developers

Apartments · price on request

Due Dec 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

Platina

BelagaviHarmony Infra

Mixed use · price on request

Due Sep 2024 · no progress reported

Reported complete

Apartments

Rajmata Residency

BelagaviJairaj Constructions

Apartments · price on request

Due Sep 2022 · no progress reported

Reported complete

Mixed use

Sai Planet

BelagaviSisa Infra

Mixed use · price on request

Due Dec 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Sai Residency

BelagaviSai Builders and Developers

Apartments · price on request

Due Dec 2025 · no progress reported

Completion date reported to RERA passed

Apartments

Serenity Homes

BelagaviSerene Builders

Apartments · price on request

Due Dec 2021 · no progress reported

Completion date reported to RERA passed

Plots

Siddhantha Enclave

BelagaviAryan Builders & Developers

Plots · price on request

Due Feb 2021 · no progress reported

Completion date reported to RERA passed

Villas & row houses

Somshanti Residency

BelagaviEkadanta Developers & Builders

Villas & row houses · price on request

Due Dec 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Vinay Plaza

BelagaviVinay Developers and Builders

Apartments · price on request

Due Jun 2022 · no progress reported

Reported complete

Apartments

Vishal’s Soni Sankul

BelagaviVishal Constructions and Developers

Apartments · price on request

Due Jun 2021 · no progress reported

Completion date reported to RERA passed

Mixed use

Wayside Apartment

BelagaviParamount Builders

Mixed use · price on request

Due Apr 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Al Fatah Apartment

BelagaviDayaar Group

Apartments · price on request

Due Jul 2019 · no progress reported

Completion date reported to RERA passed

Apartments

Amantran Anant Plaza

BelagaviMs A S Developers

Apartments · price on request

Due Aug 2019 · no progress reported

Reported complete

Mixed use

Amantran Anant Square

BelagaviMs A S Developers

Mixed use · price on request

Due Dec 2021 · no progress reported

Reported complete

Mixed use

Bang Corner

BelagaviBang Associates

Mixed use · price on request

Due Jun 2023 · no progress reported

Reported complete

Apartments

Benakanahalli

BelagaviKarnataka Housing Board

Apartments · price on request

Due Jun 2011 · no progress reported

Reported complete

Plots

CHS Yeragatti

Saundati, BelagaviKarnataka Housing Board

Plots · price on request

Due Feb 2015 · no progress reported

Reported complete

Apartments

D P Encleve

BelagaviShree Associate Builder and Developer

Apartments · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Mixed use

Datta Krupa Sankul

BelagaviAmit Builders

Mixed use · price on request

Due Dec 2020 · no progress reported

Reported complete

Plots

Ekveera BAG

BelagaviEkveera Promoters

Plots · price on request

Due Mar 2020 · no progress reported

Completion date reported to RERA passed

Mixed use

Guru Krupa Residency

BelagaviVastu Developers

Mixed use · price on request

Due Oct 2019 · no progress reported

Completion date reported to RERA passed

Apartments

inclover

BelagaviS.K.Developers

Apartments · price on request

Due Mar 2019 · no progress reported

Reported complete

Plots

Lotus Orchard

BelagaviLotus Landmarks (I) Pvt Ltd

Plots · price on request

Due Mar 2018 · no progress reported

Completion date reported to RERA passed

Mixed use

M H Constructions

BelagaviM H Constructions

Mixed use · price on request

Due Apr 2022 · no progress reported

Completion date reported to RERA passed

Plots

M S Mayur Developers and Builders

Gokak, BelagaviMayur Developers and Builders

Plots · price on request

Due Jun 2019 · no progress reported

Completion date reported to RERA passed

Plots

Lotus RVP City

BelagaviLotus Landmarks (I) Pvt Ltd

Plots · price on request

Due Sep 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Nilambika

BelagaviDeccan Properties

Apartments · price on request

Due Aug 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Omkara

BelagaviHorizon Groups

Apartments · price on request

Due Dec 2019 · no progress reported

Reported complete

Plots

R M Dhariwal President Park Nipani Plotting

BelagaviAnmol Kanhaiyalal Chhoriya

Plots · price on request

Due Jun 2022 · no progress reported

Reported complete

Mixed use

Sai Ganesh Apartment

BelagaviShri Sai Siddhi Constructions

Mixed use · price on request

Due Sep 2021 · no progress reported

Reported complete

Apartments

Sai Plaza

BelagaviGnex Infra Build

Apartments · price on request

Due Dec 2023 · no progress reported

Completion date reported to RERA passed

Apartments

Scarlett Homes

BelagaviAmar Infrabuilt

Apartments · price on request

Due Dec 2018 · no progress reported

Completion date reported to RERA passed

Apartments

Silver Heights Apartment

BelagaviDayaar Group

Apartments · price on request

Due Dec 2019 · no progress reported

Completion date reported to RERA passed

Apartments

SkyCity Homes

BelagaviVishal Infra Built Ltd.

Apartments · price on request

Due Sep 2021 · no progress reported

Reported complete

Apartments

Spar Homes

BelagaviSpar Homes

Apartments · price on request

Due Jun 2018 · no progress reported

Completion date reported to RERA passed

Apartments

The Avenue

BelagaviHome Square Developers

Apartments · price on request

Due Mar 2019 · no progress reported

Reported complete

Apartments

Venugram Emerald

BelagaviVenugram Infraventures Pvt Ltd

Apartments · price on request

Due Dec 2020 · no progress reported

Completion date reported to RERA passed

Plots

Viraj Layout

BelagaviViraj Developers

Plots · price on request

Due Jan 2021 · no progress reported

Reported complete

Apartments

Watave Wada Residency

BelagaviWatave Construction Pvt Ltd

Apartments · price on request

Due Mar 2022 · no progress reported

Completion date reported to RERA passed

Apartments

Venugram Vajra

BelagaviVenugram Infraventures Pvt Ltd

Apartments · price on request

Due Dec 2020 · no progress reported

Completion date reported to RERA passed

Apartments

Amar Enclave

BelagaviAmar constructions

Apartments · price on request

Due Dec 2019 · no progress reported

Completion date reported to RERA passed

Apartments

Amrut Sagar

BelagaviShri. Amrutkumbh Constructions Pvt Ltd

Apartments · price on request

Due Jul 2018 · no progress reported

Reported complete

Plots

CHS II Phase Gokak

Gokak, BelagaviKarnataka Housing Board

Plots · price on request

Due Dec 2012 · no progress reported

Completion date reported to RERA passed

Mixed use

Cyprus OAK

BelagaviDesai Patil Developers and Builders

Mixed use · price on request

Due Aug 2019 · no progress reported

Completion date reported to RERA passed

Plots

Government and Semi Government Employees Layout

BelagaviHMV Properties Pvt Ltd

Plots · price on request

Due Apr 2018 · no progress reported

Completion date reported to RERA passed

Mixed use

Isha Eleganza

Belagaviriddhi siddhi ventures

Mixed use · price on request

Due Mar 2019 · no progress reported

Reported complete

Plots

HMV Layout

BelagaviHMV Properties Pvt Ltd

Plots · price on request

Due Oct 2019 · no progress reported

Completion date reported to RERA passed

Mixed use

Kuber Plaza

BelagaviShree Sai Builders

Mixed use · price on request

Due Apr 2021 · no progress reported

Completion date reported to RERA passed

Apartments

Luxur Enclave A Block

BelagaviAPN Infrabuild

Apartments · price on request

Due Jan 2019 · no progress reported

Completion date reported to RERA passed

Apartments

Luxur Enclave C Block

BelagaviAPN Infrabuild

Apartments · price on request

Due Jan 2019 · no progress reported

Completion date reported to RERA passed

Apartments

Park Avenue

BelagaviSaudagar Urban Lifestlyes

Apartments · price on request

Due Apr 2018 · no progress reported

Reported complete

Apartments

Ruhi Symphony

BelagaviRuhi Habitats and Ventures LLP

Apartments · price on request

Due Feb 2019 · no progress reported

Reported complete

Mixed use

Sai Ram Arcade

BelagaviPrince Developers

Mixed use · price on request

Due Aug 2019 · no progress reported

Reported complete

Mixed use

Sairaj Empire

BelagaviSairaj Builders and Developers

Mixed use · price on request

Due Jul 2018 · no progress reported

Reported complete

Mixed use

Samarth Prestige

BelagaviShri Samarth Projects

Mixed use · price on request

Due Jul 2019 · no progress reported

Reported complete

Apartments

Shivtirth Residency

BelagaviGrahuna Builders & Developers Pvt Ltd

Apartments · price on request

Due Jul 2019 · no progress reported

Reported complete

Apartments

Shree SAI Srushti

BelagaviPanare Builders and Developers

Apartments · price on request

Due May 2019 · no progress reported

Reported complete

Apartments

Sky Nest

BelagaviVishal Infra Built Ltd.

Apartments · price on request

Due Mar 2019 · no progress reported

Reported complete

Apartments

SKY Villa DUO

BelagaviAdam Realty Partners Private Limited

Apartments · price on request

Due Apr 2017 · no progress reported

Reported complete

Apartments

THE Seven

BelagaviSeven Constructions

Apartments · price on request

Due Feb 2018 · no progress reported

Reported complete

Apartments

Vakratunda Residency

BelagaviVadiraj Associates

Apartments · price on request

Due Nov 2018 · no progress reported

Completion date reported to RERA passed

Apartments

Vastu Samdrani

BelagaviVastusiddhi Buildcon Pvt Ltd

Apartments · price on request

Due Jul 2019 · no progress reported

Reported complete

Showing 49–251 of 251

Prices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.