RERA filingPrestige Dolce Vita
ECC Road, Whitefield, BengaluruPrestige Group
2 & 3 BHK · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
1–240 of 465 matching projects · Only with photos
RERA filingECC Road, Whitefield, BengaluruPrestige Group
2 & 3 BHK · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
RERA filingECC Road, Whitefield, BengaluruPrestige Group
1 & 2 & 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
RERA filingCunningham Crescent Road, BengaluruPrestige Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSobha Limited
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthRG Unique Structures Private Limited
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSohan Reaalty
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
near AttibeleAlcove Properties
Plots · 119 plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSoftware Group
Plots · 45 plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru SouthHeritage Homes
Plots · 157 plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru EastBangalore Development Authority
2 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruG R Promoters
2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruG R Promoters
2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthTejashree Constructions
2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSRI Balaji Developers
2, 3 BHK · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Kengeri (from the reported address)SRI Dhaneshwari Builders
3 BHK · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Bengaluru SouthG R Infra
2, 3 BHK · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru NorthPurnima Constructions
2 BHK · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru SouthShree SAI Developers
2, 3 BHK · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthGK Engineers & Contractors
3 BHK · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru SouthSLV Shelters Pvt Ltd
3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSNR Square Pvt Ltd
2, 3 BHK · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSurya Builders
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthVara Constructions
2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Doddaballapura, BengaluruCentury Real Estate
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru EastTGR Projects India Pvt Ltd
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru NorthArun Shelters Pvt Ltd
3 BHK · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastVKC Developers P Ltd.,
2, 3 BHK · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruDharaniConstructions
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Hennur (from the reported address)Eminence Homes and Spaces
2 BHK · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastGarudachala Estates Pvt Ltd
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthJeevanadi Estates Private Limited
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthReddy Housing Private Limited
2, 3 BHK · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthNYK Homes
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastMSR Developers
2, 3 BHK · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Anekal, BengaluruPride Group
1, 2 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru NorthArun Shelters Pvt Ltd
2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSRI Ranjani Properties
2, 3, 6 BHK · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSLV Builders and Developers
3 BHK · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Kanakapura Road (from the reported address)SRI Vanishelters
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)S & S Builders and Developers
2, 3 BHK · price on request
RERA completion Due Jan 2021 · no progress reported
Reported complete
Bengaluru EastUnited Projects
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastZonasha Estates and Projects
4 BHK · price on request
RERA completion Due Jan 2021 · no progress reported
Reported complete
Anekal, BengaluruClassic Property Developers
Plots · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Bengaluru SouthPioneer Developers
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAdvaitha ventures Pvt Ltd
3, 4 BHK · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Hosakote, BengaluruAjagondanahalli Homes LLP
2, 3 BHK · price on request
RERA completion Due May 2021 · no progress reported
Reported complete
Bengaluru NorthCoevolve Group
1, 2, 3 BHK · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Anekal, BengaluruEast North VVS Realty
3 BHK · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Kogilu (from the reported address)RED Coral Properties
1, 2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)NVT Quality Lifestyle Projects Private Limited
4 BHK · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Bengaluru NorthPyramid Homes Private Limited
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthIbrox Real Estate Development Pvt Ltd
3, 4, 5 BHK · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Bengaluru NorthTriguna Projects Private Limited
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)SRI Nakoda Construction LTD
2, 3 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthWindsor Edifices Private Limited
3, 4 BHK · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastM S Developers and Constructions
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSouthwest Developers
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Doddaballapura, BengaluruSLNS Avyuktha Homes
Plots · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Bengaluru SouthDurga Devi Shelters
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
in PIN 560083 · Bannerghatta Road areaJ P Supreme
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Nelamangala, BengaluruKarnataka Housing Board
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruKrishnaja Constructions
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Hosakote, BengaluruSamanvaya Infra Projects
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthR M G Projects
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSAI Reniit Projects Pvt Ltd
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Bavisha Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMahendra Homes Private Limited
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)Spad Classic Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruNirman Shelters (Bangalore) Private Limited
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru EastDurga Projects & Infrastructure Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastAdharsh Projects
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Sarjapur Road (from the reported address)ARS Properties
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruIkya developers
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)ARS Properties
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruCelebrity Structures India Pvt Ltd
Plots · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruTotal Green Homes LLP
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruHithaishi Properties Private Limited
Plots · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Anekal, BengaluruClassic Property Developers
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruGolden Gates Home City
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSAI Trisha Infra Engineers Pvt Ltd
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Anekal, BengaluruAmrit Homes
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru EastS.N Builders and Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruS J Developers
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastJaishitha SRI Builders and Developers
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruEarthen Hues and Estates Private Limited
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Anekal, BengaluruClassic Ventures LLP
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Bengaluru EastVikyath Infra
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Sarjapur Road (from the reported address)VSL Srinidhi Developers
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruVakil Housing Development Corporation Private Limited
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastA.S. Builders
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Hennur (from the reported address)Aaptha Ventures
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRajeshwari Aashirvad Infra Projects Private Limited
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Devanahalli, BengaluruS & S Properties
Plots · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Varthur (from the reported address)Adithi Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Jakkur (from the reported address)Affinity Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Anekal, BengaluruBSR Developers
Plots · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruAnkuraa SAI Nitya Estates
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthBearys Properties and Developments Private Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
in PIN 560048 · Whitefield areaS2 Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthChandana Developers
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruChartered Holdings
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru NorthElegant Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru SouthGreen City Construcitons Private Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruJP Housing Corporation
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Bengaluru Eastjai infra
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Bengaluru SouthMBM Developers
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastNava Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruOM SAI Developers
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthGlobal Greens Builders and Developers S S Prasad and N Brahmananda
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruPreeti Developers Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Bengaluru SouthShree Associates
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSai Surya Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthShirdi Sai Projects
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruSands Infratech Developers India Pvt Ltd
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruYati Develoepers
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru SouthSapthagiri Infra
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Devanahalli, BengaluruPrime Construction Company
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruMaithri Developers
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Magadi, Bengalurushree sai properties
Plots · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruSL. Residential Layout Pvt.Ltd
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Budigere (from the reported address)signature properties
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Nelamangala, BengaluruSirimane Properties
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Bengaluru EastSree Lalithadevi Developers & Constructions
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru SouthSLV Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSMR Infra
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)Ms/sohan Developers
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthDs Max Group
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSunka Reddy Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSRI Nandana Builders
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Devanahalli, BengaluruIris Developers
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru NorthVaibhav Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSanathana Properties India Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthGolden Mark
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAdiga Property Developers
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Anekal, BengaluruAashish Developer and Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruAtco Projects Private Limited
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Bengaluru EastAmsha Ventures
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastSaadhana Developers
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruArunodaya Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAxis Concept Group
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthComfort Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthComfort Builders and Developers
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSpringseas Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastM s Desai Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Kengeri (from the reported address)Ds Max Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruDaiwik Group
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru SouthAshcon International Developers LLP
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Hosa Road (from the reported address)Estella Projects Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Anekal, BengaluruEstella Builders and Developers Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastExcel Stone Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthBangalore Development Authority
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastEzzy Central
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruGR Excel Prime Properties
Plots · price on request
RERA completion Due Jan 2021 · no progress reported
Reported complete
Bengaluru SouthHM Infratech Pvt Ltd & M/s. Pedigree Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthJain Housing & Construction Ltd.
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastJeevan Developers
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Kumbena Agrahara (from the reported address)Jeevan Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru NorthDs Max Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastKingston Properties
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthKNS Residency LLP
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
in PIN 560048 · Whitefield areaK R Constructions
Mixed use · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Bengaluru EastUthrankar Constructions
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Bengaluru SouthVaishnodevi Lush Greens Private Limited
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthLakshmi Narasimha Builders
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Landcapital Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Devanahalli, BengaluruShree Krishna Projects
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Nelamangala, BengaluruSRS Realty
Plots · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Bengaluru SouthDs Max Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruManasum Buildtech LLP
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthM Mohan Reddy
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruMarg Darshan Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Anekal, BengaluruLiving Structures
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Anekal, BengaluruMayur Serenity
Villas & row houses · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruConcept City Developers
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthM Mohan Reddy
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Kumbena Agrahara (from the reported address)Mighty Homes
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru EastMims Builders Private Limited
Villas & row houses · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)MR Homes
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Bengaluru SouthMythri Group
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru SouthNAG Properties LLP
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruMDR Builders and Developers
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Ramanagara, BengaluruSRI Thirumala Projects
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruA Peace Projects LLP
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Anekal, BengaluruExcel Dwellings India Pvt Ltd
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPlatina Venture
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Kanakapura Road (from the reported address)SAI Properties
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Kanakapura Road (from the reported address)Brigade Group
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru NorthPrestige Group
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthPristine Buildcon Private Limited
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru Southr k constructions
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRoma Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthGourav Engineers
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastShirdi SAI Builders
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSaranya Properties Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastSaritha Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSaroj Infrastructures
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru EastSatyadeva Builders and Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru NorthDs Max Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
in PIN 560048 · Whitefield areasravya infra projects Pvt Ltd
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru EastSeven Hills Constructions
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Hennur (from the reported address)Sri Sway Homes
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hoskote (from the reported address)Atharva Ventures
Plots · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSri Srinivasa Builders & Developers
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSrivari Infra
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Kumbena Agrahara (from the reported address)S & S Builders and Developers
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSubham Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Doddaballapura, BengaluruIndiabuild Property Developers Private Limited
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Jakkur (from the reported address)Unishire Properties LLP
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthUnishire Promoters Private Limited
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastUnited Builders
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Anekal, BengaluruUpkar Estates & Properties
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Yelahanka, BengaluruSri Mahalakshmi Constructions
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
in PIN 560048 · Whitefield areaVaishno Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthVishala and Adiga Constructions
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Anekal, BengaluruVivansaa Baalsam
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
Electronic City (from the reported address)H. N. Vijaya Raghava Reddy & Co.
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Reported complete
Budigere (from the reported address)Glenloch Properties LLP
Villas & row houses · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastYD Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Sarjapur Road (from the reported address)APG Intelli Homes Private Limited
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Whitefield (from the reported address)Alpine Housing Development Corporation Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthArvind Group
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Whitefield (from the reported address)Alpine Housing Development Corporation Limited
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruBanashree Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Bren Corporation Private Limited
Mixed use · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Anekal, BengaluruBanashree Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Panathur (from the reported address)Kansa Properties LLP
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Anekal, BengaluruCelebrity Structures India Pvt Ltd
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastTree of Life Dwellings LLP
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Bren Corporation Private Limited
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Kogilu (from the reported address)Century Real Estate
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruDamden Properties
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruDs Max Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Kengeri (from the reported address)Yashmu Projects
Mixed use · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthPalladium Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru NorthFortuna Constructions India private limited
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSadhguru Developers
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthAntevorta Developers Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Electronic City (from the reported address)Gulam Mustafa Enterprises Pvt Ltd
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)GVG Infrastructure Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Showing 1–240 of 465
Prices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.