Datta Chris
MangaluruDattaprasad Builders
Mixed use · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
5,185–5,424 of 5,698 projects · Only with photos
MangaluruDattaprasad Builders
Mixed use · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
BelagaviShree Balajee Constructions
Mixed use · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
Karkala, UdupiRehan Associates
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadKalburgi Realtors
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
UdupiGSJ Dvelopers
Mixed use · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadLaxmi SAI Investments
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Srirangapatna, MandyaEla Ventures
Plots · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadSunbeam Infrra
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
BelagaviShirgurkar Reaaltyy Private Limited
Mixed use · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruGSS Project Consultants Private Limited
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
MangaluruRohan Group
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
KalaburagiHimalaya Builders and Consultants
Apartments · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
BelagaviS S Landmark Builders and Developers
Plots · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
Hosapete, BallariSuraksha Enterprises
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MangaluruAsha Infra Developers
Mixed use · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
Srirangapatna, MandyaKBL and Sons
Plots · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
UdupiKemmale Developers
Mixed use · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruKNS Projects Private Limited
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
UdupiKote Infrastructure
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
MysuruGSS Project Consultants Private Limited
Plots · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
Malur, KolarT. Narasimhulu
Plots · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
BelagaviShivalaya Constructions
Mixed use · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadSRI SAI Groups Land Developers
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
BelagaviMadhukamal Developers
Mixed use · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
KalaburagiArihant Investments
Plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
MangaluruMarian Infrastructues
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MangaluruMasco Builders & Developers
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Malur, KolarMeenakshi Developer Bangalore Private Limited
Plots · price on request
RERA completion Due Jul 2018 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadMidmac Group
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
TumakuruMitra Structures
Apartments · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
BelagaviParth Group
Mixed use · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
Hosapete, VijayanagaraSuraksha Enterprises
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
Malur, KolarAakruthi Developer
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
MangaluruNavam Builders
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
BelagaviNavhind Infrastructure Project Private Limited
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
UdupiNayaab Developers
Mixed use · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
ChikkaballapuraNBR Group
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
MangaluruSasya Seeds LLP
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
MysuruRoyale om sai builders & developers
Plots · price on request
RERA completion Due Jul 2021 · no progress reported
Completion date reported to RERA passed
KalaburagiIshanya Builders and Developers
Mixed use · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
MysuruPalatine Projects
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
MangaluruParijatha Builders
Mixed use · price on request
RERA completion Due Oct 2022 · no progress reported
Reported complete
BelagaviPatel Developers
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
BelagaviMAC Builders and Developers
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Sidlaghatta, ChikkaballapuraSreenadh Infra Projects India Private Limited
Plots · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
BelagaviHarmony Infra
Mixed use · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadPoorvi Housing Development Company Private Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Udupipragathi developers
Plots · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
MysuruPragathi Group
Plots · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
MysuruAvishkar Infrastructure
Apartments · price on request
RERA completion Due Jun 2025 · no progress reported
Reported complete
MysuruPrithvi Infrastructure
Villas & row houses · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
BelagaviJairaj Constructions
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Puttur, MangaluruRAI Estates and Builders Private Limited
Mixed use · price on request
RERA completion Due Mar 2025 · no progress reported
Completion date reported to RERA passed
KalaburagiMohammed Akbar
Plots · price on request
RERA completion Due Feb 2023 · no progress reported
Completion date reported to RERA passed
MysuruRishabh Ventures
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadR M Bulders
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Mysurupan associates
Plots · price on request
RERA completion Due Jul 2019 · no progress reported
Reported complete
Harapanahalli, DavanagereS M B Developers
Plots · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
KalaburagiS R Constructions
Apartments · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
BelagaviSisa Infra
Mixed use · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadVanishree Group
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
UdupiMS SAI Radha Developers
Apartments · price on request
RERA completion Due Mar 2025 · no progress reported
Reported complete
BelagaviSai Builders and Developers
Apartments · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
KalaburagiSri Sai Samadhan Builders and Developer
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaNeelkamal Builders & Developers
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
MysuruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Reported complete
Malur, KolarSaroj Infrastructures
Plots · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Malur, KolarSaroj Ventures
Plots · price on request
RERA completion Due Jan 2021 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaVaishnavi Developers
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
BelagaviSerene Builders
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadVanishree Group
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
ShivamoggaShakthi Infra Developers
Plots · price on request
RERA completion Due Mar 2018 · no progress reported
Completion date reported to RERA passed
MangaluruShalimar Realty Holdings
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
KalaburagiQP Builders & Developers
Apartments · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
VijayapuraSvamitva Group
Plots · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Karwar, Uttara KannadaU B Developers & Malini Maruti Devalkar
Mixed use · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadShridatta Infratech Private Limited
Apartments · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
MysuruSri Someshwara Developers and Builders
Plots · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
BelagaviAryan Builders & Developers
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Completion date reported to RERA passed
MangaluruSiddheshwar Associates
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Karkala, UdupiKarnataka Housing Board
Plots · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadSmartcity Builders & Developers
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
MangaluruShalimar Realty Holdings
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruShri Manjunatha Swami Developers and Infrastructures Pvt Ltd
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
VijayapuraSvamitva Group
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
BelagaviEkadanta Developers & Builders
Villas & row houses · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadShridatta Infratech Private Limited
Plots · price on request
RERA completion Due Jan 2019 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadS. P. Associates
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
KolarSPH Groups
Plots · price on request
RERA completion Due Feb 2023 · no progress reported
Completion date reported to RERA passed
MangaluruThirumala Construction
Mixed use · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
Pandavapura, MandyaKarnataka Housing Board
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
MysuruS & S Builders and Developers
Plots · price on request
RERA completion Due Sep 2026 · no progress reported
Reported complete
MangaluruShalimar Realty Holdings
Apartments · price on request
RERA completion Due Aug 2023 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Oct 2025 · no progress reported
Reported complete
Hunsur, MysuruG N Rajesh
Plots · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
KalaburagiKalyan Developers
Plots · price on request
RERA completion Due Aug 2024 · no progress reported
Completion date reported to RERA passed
MysuruRamanashri Developers
Plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
BallariSPR Infra
Mixed use · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
MysuruAknavi Properties
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
MysuruSrinidhi Builders
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
MangaluruCitadel Group
Mixed use · price on request
RERA completion Due Jul 2024 · no progress reported
Reported complete
MysuruSumaya Properties Private Limited
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadSunshine Builders & Promoters
Apartments · price on request
RERA completion Due Aug 2022 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due May 2026 · no progress reported
Reported complete
ChikkaballapuraTefilah Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Hosapete, BallariS B Infra Projects
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
UdupiDeepak & Associates
Apartments · price on request
RERA completion Due Feb 2018 · no progress reported
Reported complete
MysuruArmy Welfare Housing Organisatin
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
KalaburagiSinghvi Infra
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
UdupiVasudha Constructions
Mixed use · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BelagaviVinay Developers and Builders
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
ShivamoggaVinayaka Builders and Developers
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
BelagaviVishal Constructions and Developers
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Feb 2026 · no progress reported
Reported complete
Malur, KolarYathish Kumar NK
Plots · price on request
RERA completion Due Jul 2022 · no progress reported
Completion date reported to RERA passed
Mulbagal, KolarV R Group
Plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
BelagaviParamount Builders
Mixed use · price on request
RERA completion Due Apr 2023 · no progress reported
Completion date reported to RERA passed
KolarAseem Hospitality Private limited
Mixed use · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadMWS Towers
Apartments · price on request
RERA completion Due Jan 2025 · no progress reported
Completion date reported to RERA passed
BallariSwasthik Developers
Villas & row houses · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
UdupiKhain Properties
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
MangaluruAbish Builders Private Limited
Mixed use · price on request
RERA completion Due Nov 2019 · no progress reported
Reported complete
MangaluruACE Developers
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MangaluruACE Promoters and Developers
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
MangaluruReshma Udaya Kumar
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
KolarAdisesh Project
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
KolarPardeep Vats
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
BelagaviDayaar Group
Apartments · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
MangaluruMenorah Realties Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Completion date reported to RERA passed
MysuruALL Fine Projects
Plots · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
BelagaviMs A S Developers
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
MangaluruCitadel Group
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Hosapete, BallariKarnataka Housing Board
Plots · price on request
RERA completion Due Mar 2017 · no progress reported
Reported complete
ChikkaballapuraApranje Group
Plots · price on request
RERA completion Due Mar 2017 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadArihant Infrarealty Private Limited
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Dakshina Kannada (taluk not filed), Mangaluruarnavabuildersanddevelopers
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
Dakshina Kannada (taluk not filed), Mangaluruskas builders and developers
Apartments · price on request
RERA completion Due Feb 2019 · no progress reported
Completion date reported to RERA passed
UdupiKirthi Construction
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadAum Builders and Developers
Apartments · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNikhil Developers
Apartments · price on request
RERA completion Due Feb 2018 · no progress reported
Reported complete
BelagaviMs A S Developers
Mixed use · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
MangaluruAvyuktha Infratech
Mixed use · price on request
RERA completion Due Sep 2018 · no progress reported
Reported complete
UdupiSri Ganesh Builders and Developers
Apartments · price on request
RERA completion Due Nov 2022 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadBanagar Constructions & Builders
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
BelagaviBang Associates
Mixed use · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
ChikkamagaluruSMK Developers
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
BelagaviKarnataka Housing Board
Apartments · price on request
RERA completion Due Jun 2011 · no progress reported
Reported complete
MysuruBenchmark Signature Homes
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Reported complete
UdupiBhavani Group
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
MangaluruBhoomi Groups
Mixed use · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Dakshina Kannada (taluk not filed), MangaluruKriday Builders & Promoters
Mixed use · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
UdupiBlue diamond properties holdings private limited
Apartments · price on request
RERA completion Due Feb 2019 · no progress reported
Reported complete
MysuruBrigade Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Mysurushoba properties
Plots · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Dakshina Kannada (taluk not filed), MangaluruIcare Builders & Developers
Apartments · price on request
RERA completion Due Jul 2021 · no progress reported
Reported complete
ChikkaballapuraSAMMY's Mountain Villas Limited
Plots · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Saundati, BelagaviKarnataka Housing Board
Plots · price on request
RERA completion Due Feb 2015 · no progress reported
Reported complete
Chittapur, KalaburagiShree lakshami developers
Plots · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
UdupiShambhavi Builders
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Malur, KolarD & J Corp
Plots · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
BelagaviShree Associate Builder and Developer
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
MangaluruDatta Prasad Builders & Developers
Mixed use · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
BelagaviAmit Builders
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadShrinidhi Infrastructures & Developers
Mixed use · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
KalaburagiDhananjaya Developers
Plots · price on request
RERA completion Due Feb 2024 · no progress reported
Completion date reported to RERA passed
KalaburagiShashikala Sharanappa Giri
Apartments · price on request
RERA completion Due Sep 2018 · no progress reported
Reported complete
Challakere, ChitradurgaKarnataka Housing Board
Plots · price on request
RERA completion Due Oct 2017 · no progress reported
Reported complete
MysuruGravity ONE Living Space Pvt Ltd
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
BelagaviEkveera Promoters
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Sirsi, Uttara KannadaBappanalli Brothers
Apartments · price on request
RERA completion Due May 2018 · no progress reported
Completion date reported to RERA passed
MangaluruDatta Prasad Builders & Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaArsh Construction
Mixed use · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
UdupiAakar Developers
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
ChikkaballapuraGateway Shelters Private Limited
Plots · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
KalaburagiGlobal Constructions & Developers
Plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
KoppalKarnataka Housing Board
Plots · price on request
RERA completion Due Mar 2014 · no progress reported
Reported complete
MangaluruGlobal Constructions Co.
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Gauribidanur, ChikkaballapuraVSan Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruCanh Infrastructure Limited
Plots · price on request
RERA completion Due Jan 2022 · no progress reported
Completion date reported to RERA passed
Mysurugovernment employees house building co-op.society ltd.,
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaArsh Construction
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bantwal, MangaluruValstel Builders
Mixed use · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
KalaburagiMaaz Builder & Developers
Mixed use · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
UdupiLakshmishyam Developers
Mixed use · price on request
RERA completion Due Feb 2019 · no progress reported
Reported complete
Challakere, ChitradurgaKarnataka Housing Board
Plots · price on request
RERA completion Due Oct 2017 · no progress reported
Reported complete
MangaluruGeneral Trust Infrastructure
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
BelagaviVastu Developers
Mixed use · price on request
RERA completion Due Oct 2019 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadLaxmi SAI Investments
Plots · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
MangaluruHari OM Ventures
Mixed use · price on request
RERA completion Due May 2019 · no progress reported
Reported complete
Harihara, DavanagereShree Harihara Corporation
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadHeritage Infra
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
UdupiLandmark Developers
Mixed use · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
KalaburagiBombay Builders & Consultants
Apartments · price on request
RERA completion Due Apr 2019 · no progress reported
Reported complete
BelagaviS.K.Developers
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Ranebennur, HaveriKarnataka Housing Board
Plots · price on request
RERA completion Due Jun 2016 · no progress reported
Reported complete
MangaluruInland Infrastructure Developers Private Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Udupisuresh jathan
Mixed use · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadShri Durga Developers & Promoters
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadLaxmi SAI Investments
Mixed use · price on request
RERA completion Due Jun 2018 · no progress reported
Reported complete
Bagepalli, ChikkaballapuraKaustubha Developers
Plots · price on request
RERA completion Due Jan 2022 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadAkhil Constructions
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Completion date reported to RERA passed
MangaluruAanjaneya Developers
Mixed use · price on request
RERA completion Due Jan 2019 · no progress reported
Reported complete
Srirangapatna, MandyaKamalya Builders and Developers LLP
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
MysuruBSNL Employees Housing Co Operative Society
Plots · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadKarnataka Housing Board
Plots · price on request
RERA completion Due Mar 2014 · no progress reported
Reported complete
Sidlaghatta, ChikkaballapuraAnkhor Associates
Plots · price on request
RERA completion Due Jul 2025 · no progress reported
Reported complete
Hunsur, MysuruVSan Infrastructure Pvt Ltd
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaKeshava Homes
Mixed use · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadLaxmi SAI Investments
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruRai Estates
Plots · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadShree Venkateshwara Builders and Developers
Mixed use · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaAl - Falah Construction
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Tirthahalli, ShivamoggaShree S L V Developers
Plots · price on request
RERA completion Due Apr 2018 · no progress reported
Completion date reported to RERA passed
MangaluruS S Realty
Apartments · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
Pavagada, TumakuruKarnataka Housing Board
Plots · price on request
RERA completion Due May 2017 · no progress reported
Reported complete
Somvarpet, KodaguBlossom Developers
Plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MangaluruWIN Developers
Apartments · price on request
RERA completion Due Apr 2018 · no progress reported
Reported complete
BelagaviLotus Landmarks (I) Pvt Ltd
Plots · price on request
RERA completion Due Mar 2018 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNew Home Builders
Mixed use · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Kundapura, UdupiM D Developers
Mixed use · price on request
RERA completion Due Oct 2019 · no progress reported
Completion date reported to RERA passed
BelagaviM H Constructions
Mixed use · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Gokak, BelagaviMayur Developers and Builders
Plots · price on request
RERA completion Due Jun 2019 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadSuvidha Realtors and Constructions Private Limited
Mixed use · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
ChikkaballapuraMaarq Spaces Private Limited
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadNayak Lifespaces
Mixed use · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
MangaluruAnushka Builders and Developers
Apartments · price on request
RERA completion Due Feb 2018 · no progress reported
Reported complete
MangaluruMAK Infrarealty Private Limited
Mixed use · price on request
RERA completion Due Apr 2024 · no progress reported
Reported complete
BelagaviLotus Landmarks (I) Pvt Ltd
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
KalaburagiGopal Cement Spun Pipe Works
Plots · price on request
RERA completion Due Oct 2018 · no progress reported
Reported complete
UdupiDr Jerry Vincent Dias
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
MangaluruMarian Projects Pvt Ltd
Apartments · price on request
RERA completion Due Oct 2018 · no progress reported
Reported complete
MangaluruParadise Properties
Mixed use · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Sirsi, Uttara KannadaBappanalli Brothers
Apartments · price on request
RERA completion Due May 2018 · no progress reported
Completion date reported to RERA passed
MangaluruMatha Developers Pvt Ltd
Mixed use · price on request
RERA completion Due Jan 2018 · no progress reported
Reported complete
Dakshina Kannada (taluk not filed), MangaluruNirmaan Corporation
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Showing 5,185–5,424 of 5,698
Prices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.