Elegant Altima
Bengaluru SouthElegant Group
Apartments · price on request
RERA completion Due Aug 2023 · no progress reported
Completion date reported to RERA passed
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
3,049–3,288 of 5,698 projects · Only with photos
Bengaluru SouthElegant Group
Apartments · price on request
RERA completion Due Aug 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthAllam Infinite India Private Limited
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruInfinite Builders & Developers
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruManyata Group
Apartments · price on request
RERA completion Due Jun 2025 · no progress reported
Reported complete
Bengaluru EastGodrej Properties
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Reported complete
Bengaluru EastWonder Projects Development Private Limited
Apartments · price on request
RERA completion Due May 2025 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruLimited Liability Partnershio
Apartments · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Whitefield (from the reported address)Gopalan Enterprises
Apartments · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthVijaya Lakshmi Constructions
Apartments · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Bengaluru EastCorporate Leisure and Property Developments Private Limited
Apartments · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruGlobal Edifice Group
Apartments · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
Anekal, BengaluruSAI Satya Developers
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru SouthGreen City Construcitons Private Limited
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)BS Properties
Plots · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)Mysore Projects Private Limited
Mixed use · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
Bengaluru EastIcon costructions
Apartments · price on request
RERA completion Due Jan 2023 · no progress reported
Completion date reported to RERA passed
Bannerghatta Road (from the reported address)Indus Developers
Apartments · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruJP Housing Corporation
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Bengaluru Eastjai infra
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Anekal, BengaluruJAY PEE Developers
Plots · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Bengaluru EastJayani Builders and Developers
Apartments · price on request
RERA completion Due Jul 2023 · no progress reported
Reported complete
Bengaluru SouthJCSV Builders & Developers
Apartments · price on request
RERA completion Due Apr 2025 · no progress reported
Reported complete
Bengaluru EastSindhuri Infra Projects
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruJR Housing Developers Pvt Ltd
Plots · price on request
RERA completion Due Aug 2024 · no progress reported
Reported complete
Bengaluru EastVamsiram Builders
Villas & row houses · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru NorthKanakagiri Mallikarjuna Steels and Stones Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKeystone Projects
Apartments · price on request
RERA completion Due Jun 2024 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruBCV Developers Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
Bengaluru EastKrish Infrastructures
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
Anekal, BengaluruBVL Estate Pvt Ltd,
Apartments · price on request
RERA completion Due Mar 2026 · no progress reported
Completion date reported to RERA passed
Kalkere (from the reported address)KVG Manjunath Managing Partner of K V G Builders and Developers
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthKVR Housing Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthLaksh Heights
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruS & S Builders and Developers
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Anushka Investments
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthLorven Group
Apartments · price on request
RERA completion Due Jul 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
in PIN 560048 · Whitefield areaLVS Builders and Developers
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
Bengaluru SouthEsteem Group
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Reported complete
Bengaluru SouthPrimus KNS Lifestyle Pvt Ltd
Plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Kanakapura Road (from the reported address)Mantri Developers
Apartments · price on request
RERA completion Due Apr 2025 · no progress reported
Completion date reported to RERA passed
in PIN 560048 · Whitefield areaMashri Buildtech LLP
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSAI Developers
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMBM Developers
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruMerusri Group
Plots · price on request
RERA completion Due Aug 2018 · no progress reported
Reported complete
Devanahalli, BengaluruMillennia Ventures & Projects IndPvt ltd
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Bengaluru NorthChurchill & Jerry Infrastructure
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMVS Builders
Apartments · price on request
RERA completion Due Jun 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastMitraa Properties REP by Mr Suresh Mr K Perumal Mr A Roche Arockiaraj
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastNava Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastNavajyothi Group
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Reported complete
Bengaluru NorthNavanaami Projects Private Limited
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Kalkere (from the reported address)Neeraja Developers and Promoters
Villas & row houses · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Bengaluru EastNikhar Estates LLP
Apartments · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Bengaluru SouthNR Greenwood Construction Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruOM SAI Developers
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruD J Projects Private Limited
Mixed use · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Bengaluru SouthA Peace Projects LLP
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Bengaluru SouthGlobal Greens Builders and Developers S S Prasad and N Brahmananda
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruPionier Lifestyle Phase 2
Plots · price on request
RERA completion Due Aug 2022 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruKavitha.V
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Attibele (from the reported address)Narasimha Enterprises and PNR Builders & Developers
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRajarajeshware builddcon private limited
Apartments · price on request
RERA completion Due Jan 2022 · no progress reported
Reported complete
Yelahanka, BengaluruPreeti Developers Private Limited
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Bagalur (from the reported address)Apex Realty Ventures LLP
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Reported complete
Ramanagara, BengaluruPrime Estates
Apartments · price on request
RERA completion Due Nov 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthLewis Infrastructure and Projects
Apartments · price on request
RERA completion Due Jan 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPrudent Infra
Apartments · price on request
RERA completion Due Nov 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLaniban Ventures
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru SouthRainvas Infraa
Apartments · price on request
RERA completion Due Feb 2023 · no progress reported
Reported complete
Bengaluru SouthRainbow Properties
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru NorthAikya Property Developers
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Magadi, BengaluruRashi Developers
Plots · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
Yelahanka, BengaluruPreeti Developers Private Limited
Apartments · price on request
RERA completion Due Jul 2022 · no progress reported
Completion date reported to RERA passed
Bagalur (from the reported address)Apex Realty Ventures LLP
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Reported complete
Bengaluru SouthShree Associates
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruRBD Shelters LLP
Plots · price on request
RERA completion Due Feb 2023 · no progress reported
Reported complete
Devanahalli, BengaluruGravity Infra
Plots · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
Anekal, BengaluruRD Buildtech and Developers (Karnataka) Private Limited
Plots · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRainvas Infraa
Apartments · price on request
RERA completion Due Aug 2022 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Ms. 222 Ventures
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthRenaissance Holdings and Developers Private Limited
Apartments · price on request
RERA completion Due Feb 2022 · no progress reported
Reported complete
Jakkur (from the reported address)AR Developers & Builders
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru NorthRoyale Township
Plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Bengaluru EastSudhir Salalgundla
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthS V Builders
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSai Surya Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthShirdi Sai Projects
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSairam Dwellings Private Limited
Apartments · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSAI Reniit Projects Pvt Ltd
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru NorthSattva Group (Salarpuria Sattva)
Apartments · price on request
RERA completion Due Aug 2024 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruSands Infratech Developers India Pvt Ltd
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastDs Max Group
Apartments · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Bengaluru EastSanjeevini Group
Apartments · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
Yelahanka, BengaluruSankalp Constructions Private Limited
Apartments · price on request
RERA completion Due Mar 2025 · no progress reported
Reported complete
Anekal, BengaluruYati Develoepers
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Bengaluru SouthSapthagiri Infra
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Kengeri (from the reported address)Vasundhara Builders
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSaroj Group
Apartments · price on request
RERA completion Due Feb 2023 · no progress reported
Reported complete
Varthur (from the reported address)Saroj Builders
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Hosakote, BengaluruSathya Sai Developers
Plots · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Bengaluru EastSBR Habiitat LLP
Mixed use · price on request
RERA completion Due Jul 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthScioni Projects
Plots · price on request
RERA completion Due Oct 2020 · no progress reported
Reported complete
Bengaluru NorthThe Metropolitan Cooperative Housing Society Ltd
Plots · price on request
RERA completion Due May 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthShakti Homes
Villas & row houses · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruPrime Construction Company
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruMaithri Developers
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruShivam Builders and Developer
Plots · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
Magadi, Bengalurushree sai properties
Plots · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruSL. Residential Layout Pvt.Ltd
Plots · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Magadi, BengaluruSkyreach Builders Private Limited
Plots · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
Bengaluru EastSBR Habiitat LLP
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruShriram Properties
Apartments · price on request
RERA completion Due Nov 2024 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)Subhsan Propman Private Limited
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Budigere (from the reported address)signature properties
Plots · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
Bengaluru NorthShri Maruthi Properties
Plots · price on request
RERA completion Due Feb 2022 · no progress reported
Reported complete
Nelamangala, BengaluruSirimane Properties
Plots · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Kalkere (from the reported address)Ds Max Group
Apartments · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Bengaluru EastSree Lalithadevi Developers & Constructions
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Yelahanka, BengaluruSLN Developers
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Hoskote (from the reported address)SLV Builders and Developers
Apartments · price on request
RERA completion Due Feb 2025 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSBR Habiitat LLP
Mixed use · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastShriram Properties
Plots · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSLV Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSMR Infra
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)Ms/sohan Developers
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Sowparnika Projects and Infrastructure Private Limited
Apartments · price on request
RERA completion Due Mar 2025 · no progress reported
Reported complete
Bengaluru SouthDs Max Group
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSpectra Constructions Private Limited
Apartments · price on request
RERA completion Due Mar 2025 · no progress reported
Reported complete
Anekal, BengaluruExcel Dwellings India Pvt Ltd
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
Anekal, BengaluruSunka Reddy Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSree Developers
Apartments · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSRI Balaji Shelters REP by V Ramesh & G Devarajulu
Apartments · price on request
RERA completion Due Jul 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSLV Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Jan 2022 · no progress reported
Completion date reported to RERA passed
Kalkere (from the reported address)SDR Constructions
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Anekal, BengaluruSRI Nandana Builders
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru SouthSRI Nanjundeswara Developers
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastDs Max Group
Apartments · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSpectra Constructions Private Limited
Apartments · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
Bengaluru EastRathi Constructions
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSri Vishnu Builders
Apartments · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSrishti Constructions
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
Whitefield (from the reported address)Ssvr Group
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)SRI Sumukha Builders
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru NorthSurbacon Development Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Bengaluru EastVenkateshwara Builders
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru EastSVS Developers
Apartments · price on request
RERA completion Due Sep 2026 · no progress reported
Reported complete
Bengaluru SouthThanushree Properties
Mixed use · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
Anekal, BengaluruIndiabuild Group
Plots · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthEssem18 Group
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Jakkur (from the reported address)Regal Dwellings Pvt Ltd
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
Kengeri (from the reported address)Tirumala Properties
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
Panathur (from the reported address)Ssvr Group
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSuadela Constructions Private Limited
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Devanahalli (from the reported address)Total Green Homes LLP
Plots · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthShri Aruna Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Devanahalli, BengaluruIris Developers
Plots · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Mana Projects Private Limited
Apartments · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
Bengaluru EastBhoo Developers
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Bengaluru NorthStanch ventures
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru SouthV.Venture
Mixed use · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Bengaluru SouthV2 Holdings Housing Development Private Limited
Apartments · price on request
RERA completion Due Nov 2022 · no progress reported
Reported complete
Bengaluru SouthV 6 Shelterss
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthVaibhav Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastVaishno Builders
Apartments · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
Devanahalli, BengaluruValmark Group
Plots · price on request
RERA completion Due Apr 2022 · no progress reported
Reported complete
Bengaluru SouthVandana Alpyne Projects
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthVanshika Corporation
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthKarle Homes Pvt Ltd,
Mixed use · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Bengaluru SouthGarudathri Builders and Developers
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru EastVistaspaces Sun (Raintree) Private Limited
Apartments · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSrivara Constructions
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
Hoskote (from the reported address)V R Group
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSanathana Properties India Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthWhite Lotus Lifescapes Private Limited
Apartments · price on request
RERA completion Due Jan 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthGolden Mark
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastBSR Projects
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 176 plots · price on request
Reported complete
Anekal, BengaluruBricks & Milestones
Apartments · price on request
RERA completion Due Apr 2023 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruBlue Valley Properties Private Limited
Plots · price on request
RERA completion Due Aug 2019 · no progress reported
Completion date reported to RERA passed
Electronic City (from the reported address)GM Infinite Dwelling (India) Private Limited
Villas & row houses · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAdiga Property Developers
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru EastLewis Infrastructure and Projects
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Varthur (from the reported address)Assetz Property Group
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
Sarjapur Road (from the reported address)GRS Infra
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Hosakote, BengaluruAashrayaa Projects
Plots · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Ramanagara, BengaluruABH Infrastructures
Plots · price on request
RERA completion Due Nov 2017 · no progress reported
Reported complete
Hennur (from the reported address)Varin Infra Projects Private Limited
Villas & row houses · price on request
RERA completion Due Aug 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru EastAditi Tropica
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruAditri Projects LLP
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruSRI Aditya Homes Private Limited
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Hennur (from the reported address)Adonai Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthAffinity Group
Apartments · price on request
RERA completion Due Nov 2019 · no progress reported
Reported complete
Bengaluru EastAhad Builders Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
Bengaluru NorthAjmera Housing Corporation Bangalore
Apartments · price on request
RERA completion Due Sep 2026 · no progress reported
Reported complete
Anekal, BengaluruDai Doron India Properties Private Limited
Plots · price on request
RERA completion Due Apr 2019 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruAkruti Homes Bangalore Private Limited
Apartments · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAkshaya Builders and Developers
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Bengaluru NorthAlpine Housing Development Corporation Limited
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
Yelahanka, BengaluruAmigoestella India LLP
Apartments · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
Bengaluru EastAmigo Group
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
Bengaluru EastAmrutha Rama Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
Bengaluru EastAnjan Citicon pvt.ltd
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Ahad Builders Pvt Ltd
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
Bengaluru NorthVNG Developers
Villas & row houses · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthGayathri Krishna Infrastructure Prospects Private limited
Apartments · price on request
RERA completion Due Apr 2018 · no progress reported
Completion date reported to RERA passed
in PIN 560048 · Whitefield areaIndar Constructions
Apartments · price on request
RERA completion Due Feb 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthAprameya Properties Pvt Ltd
Plots · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Bengaluru NorthApranje Group
Apartments · price on request
RERA completion Due Jul 2017 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruArattukulam Group
Apartments · price on request
RERA completion Due Jul 2019 · no progress reported
Reported complete
Bengaluru EastAmigo Group
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru EastCorporate Leisure and Property Developments Private Limited
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Jakkur (from the reported address)Narayan Enterprises
Apartments · price on request
RERA completion Due Apr 2018 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruAashish Developer and Builders
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSunrise Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru NorthSpring Valley Properties
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru EastAaspire Group
Apartments · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruCoevolve Group
Plots · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru SouthSuvastu Group
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruAtco Projects Private Limited
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Bengaluru Northatreum promoters Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
Varthur (from the reported address)ATZ Properties
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Anekal, Bengalurus2 homes
Apartments · price on request
RERA completion Due Aug 2017 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLybiana Infrastructure and Projects
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Bengaluru EastAvyak Builders
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)Axis Concept Group
Apartments · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
Bengaluru EastB M Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru EastMS Balaji Developers
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSammy’s Dreamland Co., Private Limited
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastAmsha Ventures
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Doddaballapura, BengaluruBhuvi Developers
Apartments · price on request
RERA completion Due May 2018 · no progress reported
Reported complete
Bengaluru EastJagadish v
Apartments · price on request
RERA completion Due Jul 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthApple spire India LLP
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSaadhana Developers
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Yelahanka, BengaluruArunodaya Developers
Apartments · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAxis Concept Group
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthBlue Valley Urban Infratech Private Limited,
Apartments · price on request
RERA completion Due May 2019 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)B M Developers
Apartments · price on request
RERA completion Due Jul 2016 · no progress reported
Completion date reported to RERA passed
Showing 3,049–3,288 of 5,698
Prices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.