Shankeshwar Padmavathi Nagar
Mulbagal, KolarGuru Group
Plots · 165 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
4,513–4,728 of 5,698 projects · Only with photos
Mulbagal, KolarGuru Group
Plots · 165 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadVanishree Group
Apartments · 12 units · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
BallariNairuthi Developers and Builders Private Limited
Plots · 47 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BelagaviAadishakti Construction Company
Apartments · 25 units · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
MysuruShree Vinayaka Developers
Plots · 159 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadC G Parivar Constructions
Plots · 38 plots · price on request
RERA completion Due Jan 2025 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadNewgen Homes
Plots · 65 plots · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
BelagaviSiddhakala Developers
Mixed use · 13 units · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MangaluruPearl Properties
Apartments · 20 units · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
BallariSkandhanshi Infra Projects India Private Limited
Plots · 78 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BallariSkyone Infrastructures India Private Limited
Plots · 50 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Sanduru, BallariGayathri Infra Projects
Plots · 373 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
KalaburagiS R Constructions
Apartments · 16 units · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
BallariSree SAI Developers
Plots · 46 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruSRI Balaji Developers and Promoters Mysuru Private Limited
Plots · 64 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
BallariSree GDLR Developers
Plots · 25 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
BallariSRI Jaya Skanda Developers
Plots · 36 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruSRI Lakshmi Properties
Plots · 146 plots · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
BallariArrya Group
Plots · 72 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruEarth Shasthra
Plots · 105 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
BallariSrm Oak Group
Plots · 147 plots · price on request
RERA completion Due Nov 2023 · no progress reported
Completion date reported to RERA passed
BallariSRM Infra
Plots · 174 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
KalaburagiBhoomika Developers
Plots · 178 plots · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
BallariGCS Developers LLP
Plots · 221 plots · price on request
RERA completion Due Nov 2024 · no progress reported
Completion date reported to RERA passed
MangaluruSapling Multi Ventures Private Limited
Mixed use · 42 units · price on request
RERA completion Due Dec 2029 · no progress reported
Reported complete
MysuruDeepa House Building Co Operative Society Limited
Plots · 133 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruBhoomika Housing CO Operative Society LTD
Plots · 91 plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
BallariSRI Shiva Nandi Developers
Plots · 165 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruTapovan Estates
Apartments · 47 units · price on request
RERA completion Due May 2026 · no progress reported
Completion date reported to RERA passed
BelagaviTrend Homes Realty
Apartments · 24 units · price on request
RERA completion Due Jul 2028 · no progress reported
Reported complete
BelagaviAnand Infrastructure
Apartments · 19 units · price on request
RERA completion Due Nov 2026 · no progress reported
Completion date reported to RERA passed
Hosapete, VijayanagaraJAY AEY Developers LLP
Plots · 173 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
BelagaviUnique Developers
Apartments · 16 units · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
RamanagaraV B S Project
Plots · 282 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
Sidlaghatta, ChikkaballapuraVyas Vaibhav Ventures LLP
Plots · 51 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
KalaburagiM S Constructions
Apartments · 16 units · price on request
RERA completion Due Mar 2028 · no progress reported
Reported complete
BallariSS Infra
Plots · 151 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruKPTCL Salary Employees Housing Co-operative Society ltd
Plots · 228 plots · price on request
RERA completion Due May 2023 · no progress reported
Completion date reported to RERA passed
UdupiSovereign Group
Apartments · 27 units · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
KolarV.M Builder and Developers
Plots · 202 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Mulbagal, KolarV R Group
Plots · 132 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
KalaburagiYashaswi Township Projects Pvt Ltd
Plots · 145 plots · price on request
RERA completion Due Aug 2024 · no progress reported
Reported complete
Hiriyur, ChitradurgaCMC Hiriyur
Apartments · 1,248 units · price on request
RERA completion Due Mar 2025 · no progress reported
Completion date reported to RERA passed
MysuruArihant Infrastructure
Apartments · 37 units · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Srirangapatna, MandyaAhad Builders Pvt Ltd
Plots · 89 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
ShivamoggaAishwarya Enclave
Plots · 121 plots · price on request
RERA completion Due Oct 2022 · no progress reported
Completion date reported to RERA passed
BelagaviMs A S Developers
Apartments · 25 units · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
MangaluruMohtisham Complexes Pvt Ltd
Apartments · 107 units · price on request
RERA completion Due Feb 2026 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 297 plots · price on request
RERA completion Due Nov 2027 · no progress reported
Reported complete
Turuvekere, TumakuruAnantham Gruham Developers Private Limited
Plots · 114 plots · price on request
RERA completion Due Jan 2023 · no progress reported
Reported complete
MangaluruBIG Apple Properties
Apartments · 20 units · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
KalaburagiYashaswi Township Projects Pvt Ltd
Plots · 176 plots · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
BelagaviHome Square Developers
Apartments · 10 units · price on request
RERA completion Due Jun 2024 · no progress reported
Completion date reported to RERA passed
MangaluruArnava Builders
Apartments · 37 units · price on request
RERA completion Due Oct 2025 · no progress reported
Reported complete
Srirangapatna, MandyaAhad Builders Pvt Ltd
Plots · 51 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
BallariSRI Bilva Real Estate
Plots · 63 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
VijayapuraRunwal Infrastructure Pvt Ltd
Plots · 103 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Kanakapura, RamanagaraJD Developers and Promoters
Plots · 142 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
MysuruAstrum Value Homes Private Limited
Plots · 100 plots · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 74 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BallariArrya Group
Plots · 139 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Reported complete
MysuruBalajikrupa Properties
Plots · 404 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
ChikkamagaluruBanyan Enterprises
Plots · 339 plots · price on request
RERA completion Due Jul 2025 · no progress reported
Reported complete
MangaluruShree Vigneshwara Developers
Mixed use · 46 units · price on request
RERA completion Due Jan 2025 · no progress reported
Completion date reported to RERA passed
BelagaviBramha Construction
Apartments · 11 units · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MysuruB S N L Employees Housing CoOperative Society Limited Mysore
Plots · 45 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruBVL Villas
Plots · 88 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruSRI Chamundeshwari Developers and Promoters
Plots · 60 plots · price on request
RERA completion Due Nov 2023 · no progress reported
Completion date reported to RERA passed
MysuruGS Associates
Plots · 42 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 128 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruChamundi Ventures
Plots · 35 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
BallariArrya Group
Plots · 45 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Hungund, BagalkoteKarnataka Housing Board
Plots · 560 plots · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
BallariChilukuri Enclaves
Plots · 125 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Vijayapuracommissioner city corporation Vijayapura
Apartments · 56 units · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
ShivamoggaRajiv Gandhi Housing Corporation Limited
Apartments · 168 units · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
MandyaCMC mandya
Apartments · 88 units · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
UdupiCozy Group
Apartments · 24 units · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
MysuruDaivik Developers
Plots · 48 plots · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
MysuruESS & ESS Infrastructure Private Limited
Plots · 33 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BallariSRI Ramdev Developers
Plots · 56 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MysuruDhruthi Infrastructures
Plots · 68 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
ChikkaballapuraQVC Realty Developers Private Limited
Plots · 21 plots · price on request
RERA completion Due Mar 2027 · no progress reported
Reported complete
MysuruVeeyes Rai Estates Private Limited
Plots · 610 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BelagaviAtharv Constructions
Apartments · 16 units · price on request
RERA completion Due May 2024 · no progress reported
Completion date reported to RERA passed
BelagaviSiddhayani Constructions Private Limited
Apartments · 11 units · price on request
RERA completion Due Feb 2024 · no progress reported
Completion date reported to RERA passed
BelagaviSmart Infrabuilds
Apartments · 10 units · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
MysuruFalcon Tyres Employees House Building Cooperative Society LTD
Plots · 122 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
BallariSri Rajyalakshmi Developers
Plots · 56 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MysuruT Prabhavathi and B R Madam firm
Plots · 41 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
BagalkoteGanashree Badavane
Plots · 74 plots · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
BelagaviSaudagar Urban Lifestlyes
Apartments · 36 units · price on request
RERA completion Due Mar 2025 · no progress reported
Completion date reported to RERA passed
Sidlaghatta, ChikkaballapuraGateway Shelters Private Limited
Plots · 26 plots · price on request
RERA completion Due Aug 2023 · no progress reported
Reported complete
Bantwal, MangaluruMS Bawa Builders
Mixed use · 144 units · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
BelagaviShree Balajee Constructions
Apartments · 19 units · price on request
RERA completion Due Jun 2026 · no progress reported
Reported complete
MysuruRai Estates
Plots · 157 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadKMK Developers Private Limited
Plots · 73 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Sidlaghatta, ChikkaballapuraW D Properties
Plots · 39 plots · price on request
RERA completion Due Feb 2023 · no progress reported
Reported complete
BallariArrya Group
Plots · 50 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
RamanagaraM R Infra
Plots · 228 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
BallariVirat Developers
Plots · 53 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
HaveriHaveri CMC 1112 DU's G+1 Project
Apartments · 1,112 units · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
MysuruGSS Project Consultants Private Limited
Plots · 215 plots · price on request
RERA completion Due Dec 2027 · no progress reported
Reported complete
MysuruV P Constructions & Developers
Plots · 33 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MangaluruHNGC Builders and Developers
Mixed use · 26 units · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
MangaluruKalyani Infrastructures
Mixed use · 20 units · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MysuruJPN Properties
Plots · 77 plots · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
BelagaviShree Radhakrishna Developers
Mixed use · 8 units · price on request
RERA completion Due Aug 2025 · no progress reported
Completion date reported to RERA passed
BallariArrya Group
Plots · 35 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Malur, KolarJoy Asset Group
Plots · 59 plots · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
ChikkaballapuraMDS Developers
Plots · 69 plots · price on request
RERA completion Due Jul 2022 · no progress reported
Completion date reported to RERA passed
ShivamoggaTridal Dream Developers
Apartments · 12 units · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadKanasu Enterprise
Apartments · 30 units · price on request
RERA completion Due Jan 2024 · no progress reported
Completion date reported to RERA passed
Nanjanagud, MysuruParamount Developers
Plots · 115 plots · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Mundargi, GadagKarnataka Housing Board
Plots · 651 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
MysuruMysore Realty Private Limited
Plots · 394 plots · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
BallariKonanki Developers
Plots · 55 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
KalaburagiUnique Properties Builders Developers and Promoters
Plots · 59 plots · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadSAI Soham Infra
Mixed use · 58 units · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Hosapete, VijayanagaraShamko Exim Private Limited
Plots · 37 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MysuruAlanahalli House Building Co operative Society
Plots · 87 plots · price on request
RERA completion Due Oct 2023 · no progress reported
Completion date reported to RERA passed
Hunsur, MysuruM Squaree
Plots · 121 plots · price on request
RERA completion Due Jan 2024 · no progress reported
Reported complete
MysuruSLS Developers (p) Ltd
Plots · 31 plots · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
MangaluruLotus Properties
Mixed use · 88 units · price on request
RERA completion Due Nov 2025 · no progress reported
Reported complete
RamanagaraUniversal Developers
Plots · 90 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BallariArrya Group
Plots · 43 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
KalaburagiMS Chiranjivi Developers
Plots · 44 plots · price on request
RERA completion Due Oct 2025 · no progress reported
Reported complete
BelagaviTrimount Roofs
Apartments · 12 units · price on request
RERA completion Due Aug 2024 · no progress reported
Reported complete
KalaburagiManasa Promoters and Developers
Plots · 121 plots · price on request
RERA completion Due Mar 2025 · no progress reported
Completion date reported to RERA passed
Sagara, ShivamoggaKhandige Herbs and Plantations Pvt Ltd
Plots · 179 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
MangaluruM S Pranaam Builders and Developers
Apartments · 48 units · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadUnited Build Group INC
Mixed use · 44 units · price on request
RERA completion Due Sep 2026 · no progress reported
Completion date reported to RERA passed
BelagaviParth Group
Apartments · 19 units · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MangaluruLotus Properties
Mixed use · 25 units · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
RamanagaraUniversal Developers
Plots · 168 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BelagaviA H Realty
Apartments · 18 units · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
Sidlaghatta, ChikkaballapuraMRLR Ventures
Plots · 76 plots · price on request
RERA completion Due May 2024 · no progress reported
Reported complete
MangaluruCNC Mangalore-kavoor Project Private Limited
Plots · 233 plots · price on request
RERA completion Due Sep 2024 · no progress reported
Completion date reported to RERA passed
MysuruMysore Chamarajanagar District Primary School Teachers House Building CO Operative Society Limited
Plots · 24 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
BelagaviHorizon Groups
Mixed use · 28 units · price on request
RERA completion Due Jun 2026 · no progress reported
Reported complete
ChikkaballapuraNandi Meadows
Plots · 96 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Reported complete
BelagaviNavchaitanya Developers
Mixed use · 36 units · price on request
RERA completion Due Jan 2025 · no progress reported
Reported complete
Hunsur, MysuruSri Venkateshwara Developers
Plots · 122 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MangaluruLotus Properties
Mixed use · 38 units · price on request
RERA completion Due Aug 2024 · no progress reported
Completion date reported to RERA passed
BelagaviPristine Group
Mixed use · 27 units · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
ChikkaballapuraLiving Stones
Plots · 190 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Malur, KolarNSR Ventures
Plots · 36 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
Sidlaghatta, ChikkaballapuraOptimum Shelters
Plots · 159 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
MysuruJ Cube Projects
Plots · 145 plots · price on request
RERA completion Due Jun 2024 · no progress reported
Reported complete
BelagaviHorizon Groups
Apartments · 18 units · price on request
RERA completion Due Mar 2026 · no progress reported
Reported complete
MysuruPaligha Constructions
Plots · 75 plots · price on request
RERA completion Due Nov 2023 · no progress reported
Reported complete
BelagaviP Square Construction Limited Liability Partnership
Apartments · 16 units · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Bhadravathi, ShivamoggaBhadravathi CMC
Apartments · 74 units · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
MangaluruPoonam Builders
Mixed use · 26 units · price on request
RERA completion Due Mar 2025 · no progress reported
Reported complete
Ranebennur, HaveriCity Municipal Council Commissioner
Apartments · 42 units · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
BallariArrya Group
Plots · 78 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
BallariPride Builders
Apartments · 24 units · price on request
RERA completion Due Mar 2023 · no progress reported
Completion date reported to RERA passed
MysuruPrisha Ventures
Plots · 52 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
BelagaviSairam Developers
Mixed use · 19 units · price on request
RERA completion Due Dec 2026 · no progress reported
Reported complete
BelagaviBelgaum Infra Build
Mixed use · 34 units · price on request
RERA completion Due Dec 2025 · no progress reported
Completion date reported to RERA passed
TumakuruS & S Builders and Developers
Plots · 15 plots · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Ankola, Uttara KannadaSri Ram Associates
Mixed use · 36 units · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
ShivamoggaRashi Infra
Plots · 72 plots · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
MysuruM-pro Build Groups
Apartments · 56 units · price on request
RERA completion Due Jun 2025 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaNixon Property Developers
Mixed use · 29 units · price on request
RERA completion Due Jun 2024 · no progress reported
Completion date reported to RERA passed
MysuruSRI Rajarajeshwari House Building CO Operative Society LTD
Plots · 119 plots · price on request
RERA completion Due Jan 2024 · no progress reported
Completion date reported to RERA passed
Channagiri, DavanagereS.K.Developers
Plots · 41 plots · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
KoppalGavi Constructions
Plots · 108 plots · price on request
RERA completion Due Feb 2022 · no progress reported
Reported complete
MysuruESS & ESS Infrastructure Private Limited
Plots · 107 plots · price on request
RERA completion Due Jun 2026 · no progress reported
Reported complete
MangaluruYamini builders & developers
Apartments · 24 units · price on request
RERA completion Due Jul 2024 · no progress reported
Completion date reported to RERA passed
BelagaviLacasa Builders and Developers
Apartments · 16 units · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
Hosapete, VijayanagaraSamruddhi Greens
Plots · 36 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
ShivamoggaRashi Infra
Plots · 25 plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
BelagaviSanath Initiatives
Apartments · 22 units · price on request
RERA completion Due Oct 2024 · no progress reported
Completion date reported to RERA passed
MangaluruNidhi Land Infrastructure Developers India (P) Ltd.,
Mixed use · 22 units · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
MangaluruRoyal Bawa Builders
Mixed use · 38 units · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
MysuruGravity ONE Living Space Pvt Ltd
Plots · 131 plots · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
BallariSRI Sapthagiri Developers
Plots · 286 plots · price on request
RERA completion Due Aug 2022 · no progress reported
Completion date reported to RERA passed
KalaburagiNEW Suvidha Infra
Plots · 185 plots · price on request
RERA completion Due Jan 2024 · no progress reported
Completion date reported to RERA passed
Hosapete, VijayanagaraS B Infra Projects
Apartments · 84 units · price on request
RERA completion Due Aug 2024 · no progress reported
Completion date reported to RERA passed
ChikkamagaluruShankar Shelters
Plots · 303 plots · price on request
RERA completion Due Jun 2021 · no progress reported
Completion date reported to RERA passed
Gudibanda, ChikkaballapuraShankara Agraharam
Plots · 11 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
ShivamoggaRashi Infra
Plots · 51 plots · price on request
RERA completion Due Jul 2022 · no progress reported
Reported complete
KoppalMalgi Basavaraj
Plots · 1 plots · price on request
RERA completion Due May 2025 · no progress reported
Reported complete
BelagaviTrident Landmarks
Apartments · 12 units · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
BelagaviShiva Constructions
Apartments · 25 units · price on request
RERA completion Due Jun 2023 · no progress reported
Reported complete
UdupiShivadhama Developers
Mixed use · 18 units · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
UdupiBharath Developers
Apartments · 46 units · price on request
RERA completion Due Dec 2027 · no progress reported
Reported complete
Kanakapura, RamanagaraSiddanthbuilders and Developers LLP
Plots · 140 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Sidlaghatta, ChikkaballapuraAfzal and Siddiq
Plots · 83 plots · price on request
RERA completion Due May 2024 · no progress reported
Completion date reported to RERA passed
BallariSneh Shelters Private Limited
Plots · 24 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Gudibanda, ChikkaballapuraShankara Agraharam
Plots · 6 plots · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
ShivamoggaRashi Infra
Plots · 160 plots · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
Sirsi, Uttara KannadaSMS Heights
Apartments · 12 units · price on request
RERA completion Due Mar 2024 · no progress reported
Completion date reported to RERA passed
TumakuruSvastika Kuteer Developers Private Limited
Plots · 108 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
MangaluruSorake Estates
Mixed use · 20 units · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
BallariArrya Group
Plots · 90 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
BallariMagnum Developers
Plots · 91 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
Krishnarajpet, MandyaSRI Annapoorneshwari Projects
Plots · 178 plots · price on request
RERA completion Due Dec 2025 · no progress reported
Reported complete
MysuruSri Bhoodevi Builders and Developers
Plots · 47 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaSRI Siddhi
Mixed use · 21 units · price on request
RERA completion Due Aug 2021 · no progress reported
Reported complete
MysuruSraddha Groups
Plots · 118 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
ShivamoggaRashi Infra
Plots · 75 plots · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
ChikkaballapuraShrivasa Ventures
Plots · 54 plots · price on request
RERA completion Due Feb 2024 · no progress reported
Completion date reported to RERA passed
MangaluruKateel Innovative Projects
Apartments · 46 units · price on request
RERA completion Due Oct 2025 · no progress reported
Completion date reported to RERA passed
KalaburagiShyam Developers
Plots · 148 plots · price on request
RERA completion Due Jun 2023 · no progress reported
Completion date reported to RERA passed
Kanakapura, RamanagaraSvamitva Group
Plots · 43 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
BallariSRC Developers
Plots · 80 plots · price on request
RERA completion Due Aug 2024 · no progress reported
Completion date reported to RERA passed
Malur, KolarTharakans Properties Private Limited
Plots · 111 plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Mysuruchethana Builders and developers
Plots · 36 plots · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Karwar, Uttara KannadaKeshava Group
Mixed use · 28 units · price on request
RERA completion Due Apr 2023 · no progress reported
Reported complete
MangaluruUdbhav Developers
Mixed use · 13 units · price on request
RERA completion Due Feb 2024 · no progress reported
Reported complete
Hunsur, MysuruUpkar Ventures Private Limited
Plots · 301 plots · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
MysuruUrban Lane Developers Private limited
Plots · 25 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Siruguppa, BallariM s Vijayanagara Paradise
Plots · 12 plots · price on request
RERA completion Due Dec 2022 · no progress reported
Reported complete
UdupiV Four Developers
Plots · 11 plots · price on request
RERA completion Due Dec 2023 · no progress reported
Reported complete
Showing 4,513–4,728 of 5,698
Show 24 morePrices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.