KBR Elite
Bengaluru NorthKBR Homes India Private Limited
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
3,817–4,032 of 5,698 projects · Only with photos
Bengaluru NorthKBR Homes India Private Limited
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKeerthi Estates Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru NorthKLSR Urban Properties Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Bengaluru SouthNeelanchal Landholdings LLP
Plots · price on request
RERA completion Due Nov 2019 · no progress reported
Reported complete
Bengaluru SouthHamar Narayan Raju
Apartments · price on request
RERA completion Due Feb 2017 · no progress reported
Reported complete
Electronic City (from the reported address)Kritan Urbane Living
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthKumar Properties Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Bengaluru EastUnishire Builders Private Limited
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthLalit Developers
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Bengaluru SouthPcoc Eastland Structures LLP
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru EastKeerthi Estates Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthTotal Environment
Apartments · price on request
RERA completion Due Sep 2024 · no progress reported
Reported complete
Bengaluru SouthKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru NorthLegacy Global Projects Private Limited
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
Hosa Road (from the reported address)LGCL Urban Homes (india) LLP
Villas & row houses · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLalith Gangadhar Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
Hennur (from the reported address)LGCL Properties Pvt Ltd
Villas & row houses · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru SouthGodrej Properties
Apartments · price on request
RERA completion Due Jul 2023 · no progress reported
Reported complete
Kengeri (from the reported address)Linea Properties
Apartments · price on request
RERA completion Due Feb 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthM Ramachandra
Apartments · price on request
RERA completion Due Aug 2018 · no progress reported
Reported complete
Bengaluru SouthKeerthi Estates Pvt Ltd
Mixed use · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthTotal Environment
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru SouthKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru NorthLegacy Global Projects Private Limited
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLGCL Urban Homes (india) LLP
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastLGCL Properties Pvt Ltd
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLVS Builders and Developers
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Hosakote, BengaluruM1 Properties
Villas & row houses · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Whitefield (from the reported address)Mahalakshmi Builders and Developers
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKeerthi Estates Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRED Coral Properties
Plots · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Anekal, BengaluruReddy Group
Plots · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Kogilu (from the reported address)Legacy Global Projects Private Limited
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMajestic Property Developers Private Limited
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru SouthLGCL Properties Pvt Ltd
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
in PIN 560074 · Mysore Road areaGood Group
Mixed use · price on request
RERA completion Due Dec 2017 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSri Vinayaka Builders
Apartments · price on request
RERA completion Due Apr 2018 · no progress reported
Reported complete
Bengaluru EastMana Projects Private Limited
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru EastKeerthi Estates Pvt Ltd
Mixed use · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSVG Properteis Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Yelahanka (from the reported address)Manito Northlite
Apartments · price on request
RERA completion Due Jan 2018 · no progress reported
Reported complete
Bengaluru Southmanjunathaproperties
Apartments · price on request
RERA completion Due Sep 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthGardenview Abode Private Limited
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Thanisandra (from the reported address)Mantri Developers
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru SouthLGCL Properties Pvt Ltd
Villas & row houses · price on request
RERA completion Due Jun 2019 · no progress reported
Completion date reported to RERA passed
Kanakapura Road (from the reported address)Castles Vista Private Limited
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMars Builders
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Bengaluru NorthMaxworth Realty India Limited
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMaya Ventures Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Jakkur (from the reported address)Maysonssjr Realty Pvt Ltd
Villas & row houses · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru SouthMBR Homes PVT.Ltd
Apartments · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Bengaluru EastMeda Eternity
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Bengaluru SouthMeda Greens
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthMantri Developers
Apartments · price on request
RERA completion Due Apr 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPeony Projects
Apartments · price on request
RERA completion Due Jan 2018 · no progress reported
Reported complete
Kanakapura Road (from the reported address)Castles Vista Private Limited
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Jigani (from the reported address)Milestone Builders
Apartments · price on request
RERA completion Due Oct 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKolte Patil Developers LTD
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Reported complete
Bengaluru EastWings ECO Homes Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthPalladium Group
Apartments · price on request
RERA completion Due May 2019 · no progress reported
Reported complete
Bengaluru EastMBR Homes PVT.Ltd
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Anekal, BengaluruMJR Builders Private Limited
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
in PIN 560048 · Whitefield areaMSR Builders & Developers
Apartments · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
Thanisandra (from the reported address)Mantri Developers
Apartments · price on request
RERA completion Due Feb 2023 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)MVS Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Kanakapura Road (from the reported address)Castles Vista Private Limited
Apartments · price on request
RERA completion Due Oct 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMythrielite Homes Pvt Ltd
Apartments · price on request
RERA completion Due Jan 2018 · no progress reported
Completion date reported to RERA passed
Kengeri (from the reported address)Naksha Project Pvt Ltd
Apartments · price on request
RERA completion Due May 2019 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruNakshatra Ventures
Plots · price on request
RERA completion Due May 2021 · no progress reported
Reported complete
Anekal, BengaluruGR Excel Prime Properties
Plots · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru SouthNandi Housing Private Limited
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Reported complete
Bengaluru SouthMJR Builders Private Limited
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru EastNarya Constructions and Developers
Apartments · price on request
RERA completion Due Feb 2021 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSAI Ashrivad Constructions
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Completion date reported to RERA passed
Kanakapura Road (from the reported address)Castles Vista Private Limited
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthNavanaami Projects Private Limited
Apartments · price on request
RERA completion Due Jan 2021 · no progress reported
Reported complete
Bengaluru EastNavya Builders and Developers
Apartments · price on request
RERA completion Due Nov 2018 · no progress reported
Reported complete
Hosakote, BengaluruNCC Urban Infrastructure Limited
Plots · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Varthur (from the reported address)ND Developers Pvt Ltd
Villas & row houses · price on request
RERA completion Due May 2022 · no progress reported
Completion date reported to RERA passed
Bannerghatta Road (from the reported address)Ds & Jaks Constructions
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastNeeraja Developers and Promoters
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
Bengaluru EastCarbon Developers Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Dec 2022 · no progress reported
Completion date reported to RERA passed
Nelamangala, BengaluruSmart Value Homes (Peenya Project) Private Limited
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru NorthBhartiya Urban
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Reported complete
Bengaluru NorthNitesh Group
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
Hoskote (from the reported address)Namma Mane Housing LLP
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthNCC Urban Infrastructure Limited
Plots · price on request
RERA completion Due Nov 2019 · no progress reported
Reported complete
Bengaluru NorthPalladium Group
Apartments · price on request
RERA completion Due May 2019 · no progress reported
Reported complete
Bengaluru NorthNR Greenwood Construction Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2018 · no progress reported
Reported complete
Kanakapura Road (from the reported address)NSR Projects
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru EastObel Builders
Villas & row houses · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastOceanus Dwellings Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthBhartiya Urban
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Bengaluru SouthNitesh Group
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)KSM Niketan Pvt Lted
Villas & row houses · price on request
RERA completion Due Sep 2017 · no progress reported
Reported complete
Anekal, BengaluruOmshri Infrastructures
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru SouthB and B Infrastructure LTD
Mixed use · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
Bengaluru EastInnerspaces properties Pvt Ltd
Apartments · price on request
RERA completion Due Oct 2018 · no progress reported
Reported complete
Bengaluru EastGoyal Hariyana Realty
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru EastGoyal Group
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Doddaballapura, BengaluruCountry Club Hospitality & Holidays LTD
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruExcel Dwellings India Pvt Ltd
Plots · price on request
RERA completion Due Jun 2022 · no progress reported
Reported complete
Sarjapur Road (from the reported address)KNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Bengaluru NorthOzone Group
Apartments · price on request
RERA completion Due Dec 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAdarsh Developers
Villas & row houses · price on request
RERA completion Due Aug 2021 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)Pearl Community ONE Developers Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPanchmukhi Infrastrure
Apartments · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Whitefield (from the reported address)Vishnu Priya Group of builders and Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Completion date reported to RERA passed
Bannerghatta Road (from the reported address)Pariwar Housing Corporation
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Mar 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRelationship Properties Private Limited
Apartments · price on request
RERA completion Due Sep 2018 · no progress reported
Reported complete
Whitefield (from the reported address)Parthu Estates Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Hosakote, BengaluruShashwati Realty Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2022 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruOzone Group
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru EastAdarsh Developers
Villas & row houses · price on request
RERA completion Due Nov 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru EastLily Realty Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru EastSai Sravanthi Infra Projects Pvt Ltd
Apartments · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru NorthA Peace Projects LLP
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru SouthGoodhome Realty Limited
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Anekal, BengaluruPeninsula Infra Developments Pvt Ltd,
Plots · price on request
RERA completion Due Oct 2019 · no progress reported
Reported complete
Bengaluru SouthRelationship Properties Private Limited
Apartments · price on request
RERA completion Due Mar 2023 · no progress reported
Reported complete
Hosakote, BengaluruGGR Housing India Pvt Ltd
Plots · price on request
RERA completion Due Apr 2021 · no progress reported
Reported complete
Bengaluru SouthJanapriya Engineers Syndicate Private Limited
Apartments · price on request
RERA completion Due Sep 2025 · no progress reported
Reported complete
Hosakote, BengaluruLandstar Homes
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruPioneer Developers
Apartments · price on request
RERA completion Due Sep 2022 · no progress reported
Reported complete
Anekal, BengaluruPioneer Sunblossom B Block
Apartments · price on request
RERA completion Due Feb 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthBrigade Group
Apartments · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Bengaluru EastCitrus Properties Private Limited
Plots · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
Bengaluru EastPonne Builders & Developers
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Peninsula Infra Developments Pvt Ltd,
Villas & row houses · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru SouthRelationship Properties Private Limited
Apartments · price on request
RERA completion Due Nov 2018 · no progress reported
Reported complete
Anekal, Bengaluruslv concretes
Apartments · price on request
RERA completion Due May 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPrakruthi Infra & Shelters India Pvt Ltd
Apartments · price on request
RERA completion Due Nov 2017 · no progress reported
Reported complete
Bengaluru SouthPrathamm Developers
Apartments · price on request
RERA completion Due Jun 2026 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRM Infra
Apartments · price on request
RERA completion Due Mar 2018 · no progress reported
Reported complete
Bengaluru SouthPrestige Group
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru SouthProspect Group
Apartments · price on request
RERA completion Due Apr 2017 · no progress reported
Reported complete
Bengaluru Southpristine builders
Apartments · price on request
RERA completion Due Nov 2021 · no progress reported
Reported complete
Ramanagara, BengaluruKarnataka Housing Board
Plots · price on request
RERA completion Due Aug 2017 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruPeninsula Infra Developments Pvt Ltd,
Villas & row houses · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru SouthRelationship Properties Private Limited
Apartments · price on request
RERA completion Due Jul 2018 · no progress reported
Reported complete
Bengaluru EastPujitha Homes
Apartments · price on request
RERA completion Due Aug 2018 · no progress reported
Completion date reported to RERA passed
Panathur (from the reported address)Punnami properties
Apartments · price on request
RERA completion Due Oct 2017 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPurple Estates & Holdings Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthSree PVR Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Whitefield (from the reported address)Prestige Group
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru SouthSuadela Constructions Private Limited
Mixed use · price on request
RERA completion Due Aug 2022 · no progress reported
Reported complete
Bengaluru Southpristine builders
Apartments · price on request
RERA completion Due Apr 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthR R S Builders and Developers
Apartments · price on request
RERA completion Due Sep 2018 · no progress reported
Completion date reported to RERA passed
Kengeri (from the reported address)RF Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru SouthRelationship Properties Private Limited
Apartments · price on request
RERA completion Due Dec 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKolte Patil Developers LTD
Apartments · price on request
RERA completion Due Jan 2022 · no progress reported
Reported complete
Panathur (from the reported address)Punnami properties
Apartments · price on request
RERA completion Due Oct 2017 · no progress reported
Completion date reported to RERA passed
Jakkur (from the reported address)Radiance Realty Developers India Limited
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
Bannerghatta Road (from the reported address)Radiant Structures Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthPrestige Group
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Bengaluru Eastradiant builders
Apartments · price on request
RERA completion Due Jan 2018 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRadiant Properties
Villas & row houses · price on request
RERA completion Due Dec 2019 · no progress reported
Completion date reported to RERA passed
Bannerghatta Road (from the reported address)Raja Housing Limited
Villas & row houses · price on request
RERA completion Due Aug 2022 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRBD Shelters LLP
Apartments · price on request
RERA completion Due May 2022 · no progress reported
Reported complete
Bengaluru SouthRED Tree Estates Private Limited
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru SouthKolte Patil Developers LTD
Apartments · price on request
RERA completion Due Apr 2024 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRenaissance Holdings and Developers Private Limited
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru NorthRNS Infrastructure Ltd
Apartments · price on request
RERA completion Due Mar 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRadiant Structures Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPrestige Group
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru NorthRocklines Housing Development Pvt Ltd
Mixed use · price on request
RERA completion Due Apr 2019 · no progress reported
Reported complete
Anekal, BengaluruRadiant Properties
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRR. Enterprises
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Reported complete
Hunsur, MysuruRajarajeshwari Developers and Promoters Private Limited
Plots · 31 plots · price on request
Reported complete
Anekal, BengaluruShweta and Gita Constructions India Pvt Ltd
Apartments · price on request
RERA completion Due Jan 2019 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)SV Constructions
Mixed use · price on request
RERA completion Due Mar 2021 · no progress reported
Reported complete
Bengaluru SouthSRI Vinayaka Infra
Apartments · price on request
RERA completion Due Sep 2019 · no progress reported
Completion date reported to RERA passed
Kanakapura Road (from the reported address)saf construction and projects Pvt Ltd
Apartments · price on request
RERA completion Due Oct 2018 · no progress reported
Reported complete
Bengaluru EastRadiant Structures Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPrestige Group
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru EastSai Charita Builders
Mixed use · price on request
RERA completion Due Dec 2016 · no progress reported
Reported complete
Anekal, BengaluruS R Developers
Apartments · price on request
RERA completion Due Aug 2019 · no progress reported
Reported complete
Bengaluru EastSowbagya Developerrs Private Limited
Apartments · price on request
RERA completion Due May 2019 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruShri Saideep Estates
Mixed use · price on request
RERA completion Due Apr 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSAI Aasha Developers
Plots · price on request
RERA completion Due Mar 2019 · no progress reported
Reported complete
Anekal, BengaluruSaiven Developers and Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru SouthSRI Vinayaka Infra
Apartments · price on request
RERA completion Due Jan 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru Southsaf construction and projects Pvt Ltd
Mixed use · price on request
RERA completion Due Aug 2019 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPluto Realtors Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2019 · no progress reported
Reported complete
Bengaluru EastPrestige Group
Apartments · price on request
RERA completion Due Dec 2019 · no progress reported
Reported complete
Bengaluru EastSattva Group (Salarpuria Sattva)
Apartments · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Thanisandra (from the reported address)Samprasiddhi Infratech
Apartments · price on request
RERA completion Due Jul 2017 · no progress reported
Reported complete
Bengaluru SouthSamruddhi Realty Limited
Apartments · price on request
RERA completion Due Jun 2018 · no progress reported
Completion date reported to RERA passed
Whitefield (from the reported address)Sanvi Properties
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru NorthSaptagiri Developers & CO
Apartments · price on request
RERA completion Due Jun 2018 · no progress reported
Reported complete
Bengaluru EastSaritha Developers
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru EastSatwi Infra
Apartments · price on request
RERA completion Due Sep 2021 · no progress reported
Reported complete
Bengaluru EastSatyadeva Builders
Apartments · price on request
RERA completion Due Nov 2019 · no progress reported
Reported complete
Bengaluru EastSBR Group
Mixed use · price on request
RERA completion Due Jun 2021 · no progress reported
Reported complete
Varthur (from the reported address)Prestige Group
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru NorthSattva Group (Salarpuria Sattva)
Apartments · price on request
RERA completion Due Sep 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru EastShakthi Golden Home Properties
Apartments · price on request
RERA completion Due Nov 2018 · no progress reported
Completion date reported to RERA passed
Bannerghatta Road (from the reported address)Shell Promoters and Infra Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
Bengaluru EastShilpa Enterprises
Villas & row houses · price on request
RERA completion Due Sep 2017 · no progress reported
Reported complete
Bengaluru NorthMaithri Developers
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
MysuruNethaji Gruha Nirmana Sahakara sangha
Plots · 28 plots · price on request
Reported complete
Bengaluru SouthShravanee Associates
Apartments · price on request
RERA completion Due Sep 2017 · no progress reported
Reported complete
Bengaluru SouthShravanee Builders
Apartments · price on request
RERA completion Due Dec 2017 · no progress reported
Reported complete
Bengaluru SouthShravanee Shelters
Apartments · price on request
RERA completion Due May 2021 · no progress reported
Completion date reported to RERA passed
Bengaluru EastPrestige Group
Apartments · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Devanahalli, BengaluruSattva Group (Salarpuria Sattva)
Apartments · price on request
RERA completion Due Dec 2023 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthShravanthi Shelters
Villas & row houses · price on request
RERA completion Due Dec 2018 · no progress reported
Reported complete
BallariShree Gavisiddeshwara Developers
Plots · 96 plots · price on request
Reported complete
Showing 3,817–4,032 of 5,698
Show 24 morePrices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.