sobha.comSobha Clovelly
Padmanabhanagar, BengaluruSobha Limited
Starting From INR 1.99 Crore*developer’s price
RERA completion Due Oct 2020 · no progress reported
Reported complete
Pinly lists every residential and plotted project on the Karnataka RERA register that a company, firm or public body filed — 5,698 projects by 3,215 developers. Phases of one project are grouped under one name.
The first list shows the 119 projects with the developer’s own photos. Any search or filter covers every project.
Filters only use what was filed or published. Developers publish a price for 80 projects and bedroom counts are known for 640. Budget and BHK only find those. Pinly never estimates.
Neighbourhoods come from the location, PIN code or address reported to RERA, and each project says which (1,528 of 3,686 Bengaluru projects have one). All neighbourhoods →
1–192 of 210 matching projects · Only with photos
sobha.comPadmanabhanagar, BengaluruSobha Limited
Starting From INR 1.99 Crore*developer’s price
RERA completion Due Oct 2020 · no progress reported
Reported complete
near AnekalDaadys Builders Private Limited
Plots · 37 plots · price on request
RERA completion Due Sep 2020 · no progress reported
Completion date reported to RERA passed
near Airport RoadSri Satya Sai Constructions
Plots · 62 plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastARR Developers
2, 3 BHK · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru EastChethana Builders
2, 3 BHK · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru SouthABS Builders and Developers
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)SRI Infra Structures
1, 2 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)SRI Balaji Builders
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
in PIN 560048 · Whitefield areaSJ Constructions
2, 3 BHK · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru SouthG R Promoters
2, 3 BHK · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru EastG R Builders
2, 3 BHK · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru EastHi Life Homes
2, 3 BHK · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSree & Sree Builders & Promoters
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthRenaissance Holdings and Developers Private Limited
3 BHK · price on request
RERA completion Due Apr 2020 · no progress reported
Reported complete
Kengeri (from the reported address)SAI Kiran Constructions
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Varthur (from the reported address)Swathi Builders and Properties
2, 3 BHK · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
Bengaluru EastUrbanest Group
2, 3 BHK · price on request
RERA completion Due Apr 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastFortuna Constructions India private limited
2, 3 BHK · price on request
RERA completion Due Sep 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthPrisha Properties India Private Limited
2, 3, 4 BHK · price on request
RERA completion Due Jul 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru Eastkruthi developers
2, 3 BHK · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Confident Projects India Private Limited
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Devanahalli, BengaluruMerusri Real Estate Developers Pvt Ltd
Plots · price on request
RERA completion Due Apr 2020 · no progress reported
Completion date reported to RERA passed
Ramanagara, BengaluruSLV Ventures India Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthVSL Srinidhi Realties
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru NorthPrestige Group
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Anekal, BengaluruClassic Ventures LLP
Plots · price on request
RERA completion Due Apr 2020 · no progress reported
Reported complete
Bengaluru NorthS V Consultants and Engineers
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthAmbiant Group
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastConfident Projects India Private Limited
Plots · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru NorthLaksh Heights
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruS & S Builders and Developers
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Devanahalli, BengaluruMillennia Ventures & Projects IndPvt ltd
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Anekal, BengaluruSAI Reniit Projects Pvt Ltd
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru NorthScioni Projects
Plots · price on request
RERA completion Due Oct 2020 · no progress reported
Reported complete
Kalkere (from the reported address)SDR Constructions
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru SouthThanushree Properties
Mixed use · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
Bengaluru SouthEssem18 Group
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru NorthStanch ventures
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Electronic City (from the reported address)GM Infinite Dwelling (India) Private Limited
Villas & row houses · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)GRS Infra
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Bengaluru EastAditi Tropica
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruAditri Projects LLP
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Hennur (from the reported address)Adonai Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastAhad Builders Pvt Ltd
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
Bengaluru NorthAlpine Housing Development Corporation Limited
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
Bengaluru NorthSunrise Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru NorthSpring Valley Properties
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Doddaballapura, BengaluruArunapanchami Estates Private Limited
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Hosakote, BengaluruDaiwik Group
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Hennur (from the reported address)Eswar Constructions
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Devanahalli, BengaluruDukes Stellar Infracon Developers LLP
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthLakshmiwan Polymers Private Limited
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Emmanuel Constructions Private Limited
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru NorthHarina Developers Pvt Ltd
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru SouthGunina Structures
Apartments · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Bengaluru SouthJhanavi Group
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Ramanagara, BengaluruKempu Developers
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPoornachandra Enterprises
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Kalkere (from the reported address)Retreat Properties
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastInner spaces
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru NorthTrishul Developers
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Sarjapur Road (from the reported address)Manyata Group
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
Anekal, BengaluruJRC Projects
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru EastSAI Purvi Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Hosakote, BengaluruRadiance Realty Developers India Limited
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Devanahalli, BengaluruManiveera Structure Private Limited
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru NorthLewis Infrastructure and Projects
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru NorthTaapasi Properties
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru EastRR Constructions
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastSri Dwaraka Builders and Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthSairam Constructions
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSampada Developers
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Anekal, BengaluruPragathi Group
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru Northsashwath developers
Apartments · price on request
RERA completion Due Apr 2020 · no progress reported
Reported complete
Bengaluru EastSekhar Builders and Infratech Private Limited
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru EastShreyas Ventures
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru SouthSiddh Shekha Developer LLP
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru SouthSNR Square Pvt Ltd
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru EastSoundarya Constructions
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthCanopy Homes & Holdings LLP
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastSowmya Builders and Developers
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Devanahalli, BengaluruTotal Green Homes LLP
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Anekal, BengaluruUnicon Group
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastUbercorp Infrastructure LLP
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru NorthVSPL Projects Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastEssem18 Group
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Anekal, BengaluruArattukulam Group
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Devanahalli, BengaluruBrigade Group
Villas & row houses · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bengaluru EastCasa Grande Garden City Builders Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru EastBren Corporation Private Limited
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru SouthElegant Group
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastECO Life Developers
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Doddaballapura, BengaluruElite Estates
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Budigere (from the reported address)Whitestone Projects
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru EastFrontier Shelters Pvt Ltd
Apartments · price on request
RERA completion Due Nov 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastG K Shelters Private Limited
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastIT Estates
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruGopalan Enterprises
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru EastGriha Promoters Pvt Ltd
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Sarjapur Road (from the reported address)Golden Gate Properties LTD
Plots · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthHoysala Group
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastKeerthi Estates Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthKNS Infrastructure Private Limited
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru EastLGCL Urban Homes (india) LLP
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Kogilu (from the reported address)Legacy Global Projects Private Limited
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru NorthL and T Realty Developers Limited
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Bengaluru SouthLGCL Properties Pvt Ltd
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Thanisandra (from the reported address)Mantri Developers
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru NorthMaxworth Realty India Limited
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruOmshri Infrastructures
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru SouthMantri Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthRED Tree Estates Private Limited
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru EastRenaissance Holdings and Developers Private Limited
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru SouthRadiant Structures Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthPrestige Group
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Anekal, BengaluruRadiant Properties
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru EastRadiant Structures Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Anekal, BengaluruSaiven Developers and Constructions Pvt Ltd
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Varthur (from the reported address)Prestige Group
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Bengaluru EastPrestige Group
Apartments · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Bengaluru EastShriram Properties
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Bengaluru NorthSidvin Group
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru SouthPrestige Group
Apartments · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Bengaluru NorthPrestige Group
Apartments · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Bengaluru NorthPrestige Group
Villas & row houses · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Bengaluru NorthSruthika Builders & Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Anekal, BengaluruSubha Builders and Developers
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
Sarjapur Road (from the reported address)IndiaBuild Villas Development Pvt Ltd
Villas & row houses · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Thanisandra (from the reported address)sai kalyan builders and developers private limited
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Bengaluru SouthVaastu Structures Pvt Ltd
Apartments · price on request
RERA completion Due Oct 2020 · no progress reported
Reported complete
Bengaluru SouthVista Merez
Apartments · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
Chintamani, ChikkaballapuraCity Municipal Council Chintamani
Apartments · 18 units · price on request
RERA completion Due Jun 2020 · no progress reported
Completion date reported to RERA passed
Bangarapet, KolarMunicipal Commissioner
Apartments · 60 units · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Ranebennur, HaveriCity Municipal Council Commissioner
Apartments · 42 units · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Malur, KolarTharakans Properties Private Limited
Plots · 111 plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Bangarapet, KolarTown Municipal Council Bangarpet
Apartments · 10 units · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
MangaluruDion Group
2 BHK · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
MangaluruAashirwad Infra Developers
1, 2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
DavanagereKaveri Builders
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
MangaluruShafcon
Apartments · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
ShivamoggaRashi Infra
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
MysuruAstrum Value Homes Private Limited
2, 3 BHK · price on request
RERA completion Due Jun 2020 · no progress reported
Completion date reported to RERA passed
MangaluruErrol R Pinto
2, 3, 4 BHK · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadShelter Housing Services Pvt Ltd
2, 3 BHK · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
ChikkaballapuraElite Properties
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
ShivamoggaBharath Builders and Developers
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
MangaluruMangaluru City Corporation
Apartments · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
UdupiMS Image Muskan Developers
Mixed use · price on request
RERA completion Due Nov 2020 · no progress reported
Completion date reported to RERA passed
KolarAdisesh Project
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
MysuruAayush Builders & Developers
Mixed use · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
VijayapuraV G Parekh and Co
Plots · price on request
RERA completion Due Jul 2020 · no progress reported
Reported complete
UdupiDreamland Promoters and Developers
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Bhadravathi, ShivamoggaRashi Infra
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
MangaluruSindhu Corporation
Apartments · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
MangaluruRAI Estates and Builders Private Limited
Mixed use · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
VijayapuraV G Parekh and Co
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
HaveriKarnataka Housing Board
Plots · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
ShivamoggaS R Naina Yashodamma and vinayaka Builders and Delvopers
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Completion date reported to RERA passed
Moodabidri, MangaluruVishal Developers
Mixed use · price on request
RERA completion Due Oct 2020 · no progress reported
Reported complete
Sidlaghatta, Chikkaballapuraadithya ventures
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Reported complete
MysuruCaliber Properties
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
ShivamoggaEshwar Builders and Developers
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Karkala, UdupiRehan Associates
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadSRI SAI Groups Land Developers
Plots · price on request
RERA completion Due Jan 2020 · no progress reported
Completion date reported to RERA passed
Hubballi, Hubballi-DharwadMidmac Group
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
MangaluruSasya Seeds LLP
Plots · price on request
RERA completion Due Feb 2020 · no progress reported
Reported complete
Hubballi, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Karwar, Uttara KannadaNeelkamal Builders & Developers
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadSmartcity Builders & Developers
Apartments · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
VijayapuraSvamitva Group
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
MysuruSrinidhi Builders
Plots · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Hosapete, BallariS B Infra Projects
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
MangaluruACE Promoters and Developers
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadArihant Infrarealty Private Limited
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
UdupiKirthi Construction
Apartments · price on request
RERA completion Due Jan 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadAum Builders and Developers
Apartments · price on request
RERA completion Due Oct 2020 · no progress reported
Completion date reported to RERA passed
UdupiBhavani Group
Apartments · price on request
RERA completion Due May 2020 · no progress reported
Reported complete
BelagaviAmit Builders
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
Dharwad, Hubballi-DharwadShrinidhi Infrastructures & Developers
Mixed use · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
BelagaviEkveera Promoters
Plots · price on request
RERA completion Due Mar 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadNeelgund Developers & Builders Pvt Ltd
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Reported complete
UdupiAakar Developers
Mixed use · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Mysurugovernment employees house building co-op.society ltd.,
Plots · price on request
RERA completion Due Aug 2020 · no progress reported
Completion date reported to RERA passed
Bantwal, MangaluruValstel Builders
Mixed use · price on request
RERA completion Due Nov 2020 · no progress reported
Reported complete
Harihara, DavanagereShree Harihara Corporation
Plots · price on request
RERA completion Due Dec 2020 · no progress reported
Completion date reported to RERA passed
Dharwad, Hubballi-DharwadShri Durga Developers & Promoters
Apartments · price on request
RERA completion Due Aug 2020 · no progress reported
Reported complete
Srirangapatna, MandyaKamalya Builders and Developers LLP
Plots · price on request
RERA completion Due Sep 2020 · no progress reported
Reported complete
MysuruBSNL Employees Housing Co Operative Society
Plots · price on request
RERA completion Due Jun 2020 · no progress reported
Reported complete
Showing 1–192 of 210
Show 18 morePrices are shown only where the developer publishes one, exactly as written. Construction progress, completion dates and progress reports to RERA are as filed with Karnataka RERA. Canonical listing: https://pinly9.khosha.tech/projects.